IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,751

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0565 # 01 Y:2011 01 2011 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $14,900 $9,340 Implemented
OR0565 # 02 Y:2011 02 2011 INSULATE BARE EQUIPMENT $6,110 $21,715 Implemented
OR0565 # 03 Y:2011 03 2011 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $10,300 $17,700 Implemented
OR0565 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,900 $10,900 Implemented
OR0565 # 06 Y:2011 06 2011 HEAT WATER WITH EXHAUST HEAT $77,370 $96,750 Implemented
MZ0061 # 01 Y:2010 01 2010 USE OPTIMUM THICKNESS INSULATION $145 $300 Implemented
MZ0061 # 02 Y:2010 02 2010 USE OPTIMUM THICKNESS INSULATION $79 $1,200 Implemented
MZ0061 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $36,947 $2,160 Implemented
MZ0061 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,019 $0 Implemented
MZ0061 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,184 $0 Implemented
MZ0061 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $62,160 $3,680 Implemented
MZ0061 # 08 Y:2010 08 2010 REDUCE SCRAP PRODUCTION $92,766 $100,000 Implemented
MZ0061 # 11 Y:2010 11 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,994 $5,000 Implemented
MZ0060 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $32,699 $5,400 Implemented
DL0063 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $35,600 $100 Implemented
DL0063 # 02 Y:2010 02 2010 REDUCE VENTILATION AIR $34,080 $500 Implemented
DL0063 # 03 Y:2010 03 2010 INCREASE AMOUNT OF CONDENSATE RETURNED $31,600 $1,610 Implemented
DL0063 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,900 $166,850 Implemented
DL0063 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,000 $3,000 Implemented
DL0063 # 09 Y:2010 09 2010 REDUCE EXCESS STEAM BLEEDING $14,034 $419 Implemented
DL0063 # 10 Y:2010 10 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $16,180 $1,000 Implemented
DL0063 # 11 Y:2010 11 2010 INSTALL OCCUPANCY SENSORS $12,978 $1,012 Implemented
DL0063 # 12 Y:2010 12 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $11,600 $1,585 Implemented
DL0063 # 15 Y:2010 15 2010 CLOSE OFF UNNEEDED STEAM LINES $3,627 $400 Implemented
DL0063 # 18 Y:2010 18 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $733 $615 Implemented