Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
589
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0426 # 09 Y:2009 | 09 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,528 | $628 | Implemented |
UF0414 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,527 | $7,379 | Implemented |
UF0414 # 03 Y:2008 | 03 | 2008 | OPTIMIZE PLANT POWER FACTOR | $44,500 | $13,000 | Implemented |
UF0414 # 04 Y:2008 | 04 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,808 | $15,562 | Implemented |
UF0414 # 05 Y:2008 | 05 | 2008 | INSTALL OCCUPANCY SENSORS | $255 | $39 | Implemented |
UF0414 # 06 Y:2008 | 06 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $2,447 | $371 | Implemented |
UF0412 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,683 | $42,414 | Implemented |
UF0412 # 03 Y:2008 | 03 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $12,505 | $731 | Implemented |
UF0412 # 05 Y:2008 | 05 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $17,781 | $615 | Implemented |
UF0412 # 06 Y:2008 | 06 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $2,521 | $0 | Implemented |
UF0412 # 08 Y:2008 | 08 | 2008 | INSTALL SET-BACK TIMERS | $15,103 | $4,916 | Implemented |
UF0412 # 09 Y:2008 | 09 | 2008 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $1,822 | $10,480 | Implemented |
UF0412 # 11 Y:2008 | 11 | 2008 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $9,359 | $4,246 | Implemented |
UF0407 # 02 Y:2008 | 02 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,924 | $9,726 | Implemented |
UF0407 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,672 | $762 | Implemented |
UF0407 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,409 | $0 | Implemented |
UF0407 # 06 Y:2008 | 06 | 2008 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,021 | $0 | Implemented |
UF0407 # 07 Y:2008 | 07 | 2008 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $20,238 | $21,568 | Implemented |
UF0407 # 08 Y:2008 | 08 | 2008 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $13,104 | $796 | Implemented |
UF0406 # 05 Y:2007 | 05 | 2007 | REPAIR AND ELIMINATE STEAM LEAKS | $17,857 | $619 | Implemented |
UF0406 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,557 | $714 | Implemented |
UF0406 # 07 Y:2007 | 07 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $229,959 | $0 | Implemented |
UF0406 # 09 Y:2007 | 09 | 2007 | USE OPTIMUM THICKNESS INSULATION | $7,084 | $1,380 | Implemented |
MI0147 # 01 Y:2007 | 01 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $20,581 | $16,000 | Implemented |
MI0147 # 02 Y:2007 | 02 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,498 | $1,750 | Implemented |