IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

272

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0143 # 04 Y:1998 04 1998 USE PHOTOCELL CONTROLS $6,026 $2,250 Implemented
SF0143 # 05 Y:1998 05 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,067 $4,684 Implemented
SF0143 # 06 Y:1998 06 1998 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $78,251 $99,600 Implemented
SF0143 # 07 Y:1998 07 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,701 $9,000 Implemented
SF0143 # 08 Y:1998 08 1998 INSULATE BARE EQUIPMENT $468 $1,138 Implemented
UL0195 # 04 Y:1998 04 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $2,628 $0 Implemented
UL0195 # 07 Y:1998 07 1998 $70,000 $0 Implemented
UL0195 # 08 Y:1998 08 1998 $105,000 $300,000 Implemented
OK0546 # 02 Y:1998 02 1998 INSTALL SOLID WASTE INCINERATOR FOR HEAT $10,400 $7,900 Implemented
OK0546 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,438 $5,916 Implemented
OK0546 # 06 Y:1998 06 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,273 $2,460 Implemented
OK0546 # 07 Y:1998 07 1998 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,398 $500 Implemented
OK0546 # 10 Y:1998 10 1998 INSULATE BARE EQUIPMENT $176 $542 Implemented
KU0495 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,680 $390 Implemented
KU0495 # 03 Y:1998 03 1998 USE SYNTHETIC LUBRICANT $3,080 $2,650 Implemented
KU0495 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,380 $1,490 Implemented
KU0495 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,550 $490 Implemented
KU0495 # 09 Y:1998 09 1998 METER WASTE WATER $850 $100 Implemented
WI0325 # 02 Y:1998 02 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,848 $500 Implemented
OK0548 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,020 $400 Implemented
OK0548 # 05 Y:1998 05 1998 INSTALL OCCUPANCY SENSORS $1,104 $1,566 Implemented
KU0493 # 01 Y:1998 01 1998 USE OPTIMUM TEMPERATURE $28,340 $3,500 Implemented
KU0493 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,340 $9,530 Implemented
KU0493 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,290 $4,940 Implemented
KU0493 # 05 Y:1998 05 1998 ISOLATE HOT OR COLD EQUIPMENT $1,310 $1,000 Implemented