IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

136

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0835 # 01 Y:2022 01 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,572 $40,722 Implemented
MA0835 # 02 Y:2022 02 2022 USE HEAT PUMP FOR SPACE CONDITIONING $2,773 $7,150 Implemented
MA0835 # 04 Y:2022 04 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $680 $750 Implemented
MA0836 # 08 Y:2022 08 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,781 $625 Implemented
MA0836 # 07 Y:2022 07 2022 USE HEAT PUMP FOR SPACE CONDITIONING $2,777 $7,150 Implemented
MA0836 # 06 Y:2022 06 2022 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $7,372 $500 Implemented
MA0836 # 03 Y:2022 03 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $9,895 $23,950 Implemented
MA0836 # 05 Y:2022 05 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,531 $1,500 Implemented
ME0304 # 05 Y:2000 05 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $29,835 $4,434 Implemented
ME0304 # 04 Y:2000 04 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $1,848 $0 Implemented
ME0290 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,690 $5,000 Implemented
ME0290 # 08 Y:2000 08 2000 MOVE PRODUCT USING MECHANICAL MEANS $26,063 $13,600 Implemented
ME0290 # 03 Y:2000 03 2000 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,732 $1,800 Implemented
ME0290 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,685 $2,475 Implemented
ME0289 # 02 Y:2000 02 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $3,387 $3,165 Implemented
ME0289 # 05 Y:2000 05 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,507 $2,400 Implemented
ME0279 # 09 Y:1999 09 1999 MINIMIZE WATER USAGE $751 $1,345 Implemented
ME0279 # 03 Y:1999 03 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $12,800 $0 Implemented
ME0279 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $201 $89 Implemented
ME0279 # 02 Y:1999 02 1999 INSULATE BARE EQUIPMENT $36,509 $13,360 Implemented
ME0279 # 05 Y:1999 05 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,720 $6,216 Implemented
ME0266 # 09 Y:1999 09 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $401 $85 Implemented
ME0266 # 07 Y:1999 07 1999 RECOVER WASTE HEAT FROM EQUIPMENT $740 $1,490 Implemented
ME0266 # 11 Y:1999 11 1999 REDUCE OR ELIMINATE WASTE $1,612 $300 Implemented
ME0266 # 06 Y:1999 06 1999 REPAIR AND ELIMINATE STEAM LEAKS $1,176 $100 Implemented