IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1014 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $28,500 $18,326 Implemented
UD0995 # 03 Y:2019 03 2019 REPAIR OR REPLACE STEAM TRAPS $5,974 $1,800 Implemented
UD0995 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $1,159 $3,500 Implemented
UD0995 # 07 Y:2019 07 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $5,847 $11,694 Implemented
UD0995 # 08 Y:2019 08 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $606 $0 Implemented
UD0995 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,887 $17,856 Implemented
UD0995 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,443 $1,500 Implemented
UD0938 # 02 Y:2015 02 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,298 $0 Implemented
UD0938 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $152 $530 Implemented
UD0938 # 06 Y:2015 06 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,415 $0 Implemented
WV0502 # 01 Y:2015 01 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $13,685 $1,000 Implemented
WV0502 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,334 $25,930 Implemented
WV0502 # 03 Y:2015 03 2015 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $12,681 $18,000 Implemented
WV0502 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $3,350 $724 Implemented
WV0502 # 08 Y:2015 08 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,826 $500 Implemented
WV0502 # 09 Y:2015 09 2015 INSULATE BARE EQUIPMENT $812 $2,934 Implemented
WV0502 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $321 $854 Implemented
UM0272 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,828 $1,000 Implemented
UM0272 # 03 Y:2005 03 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,631 $300 Implemented
UD0586 # 04 Y:2000 04 2000 MINIMIZE WATER USAGE $18,654 $298 Implemented
UD0586 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,183 $0 Implemented
WV0109 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,527 $5,295 Implemented
WV0109 # 05 Y:1997 05 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $26,265 $3,000 Implemented
WV0109 # 06 Y:1997 06 1997 DIRECT WARMEST AIR TO COMBUSTION INTAKE $7,904 $6,300 Implemented
WV0109 # 07 Y:1997 07 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,550 $441 Implemented