IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0910 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,309 $1,250 Implemented
OK0910 # 07 Y:2015 07 2015 INSTALL TIMERS AND/OR THERMOSTATS $2,710 $2,471 Implemented
OK0910 # 08 Y:2015 08 2015 REPAIR AND ELIMINATE STEAM LEAKS $18,886 $375 Implemented
OK0910 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $70,459 $247,939 Implemented
OK0866 # 14 Y:2013 14 2013 REDUCE HEAT GAIN BY WINDOW TINTING $1,077 $16,000 Implemented
OK0866 # 11 Y:2013 11 2013 INSULATE BARE EQUIPMENT $232 $280 Implemented
OK0866 # 05 Y:2013 05 2013 INSTALL SET-BACK TIMERS $449 $318 Implemented
OK0866 # 04 Y:2013 04 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $4,776 $1,440 Implemented
OK0713 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $26,495 $85,051 Implemented
OK0713 # 01 Y:2005 01 2005 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $81,171 $1,436 Implemented
OK0713 # 03 Y:2005 03 2005 USE COMPRESSOR AIR FILTERS $5,346 $35 Implemented
OK0713 # 04 Y:2005 04 2005 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $48,000 $35 Implemented
OK0701 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $43,354 $1,623 Implemented
OK0701 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,396 $8,850 Implemented
OK0701 # 01 Y:2005 01 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $11,182 $123,420 Implemented
OK0695 # 04 Y:2004 04 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,723 $21,750 Implemented
OK0695 # 06 Y:2004 06 2004 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $6,830 $0 Implemented
OK0634 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $218 $255 Implemented
OK0634 # 10 Y:2002 10 2002 REPAIR OR REPLACE STEAM TRAPS $33,934 $525 Implemented
OK0634 # 08 Y:2002 08 2002 UPGRADE CONTROLS ON COMPRESSORS $7,297 $1,028 Implemented
OK0634 # 02 Y:2002 02 2002 OPERATE BOILERS ON HIGH FIRE SETTING $2,910 $4,125 Implemented
OK0634 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $992 $1,679 Implemented
OK0634 # 01 Y:2002 01 2002 INSULATE BARE EQUIPMENT $2,496 $823 Implemented
OK0457 # 08 Y:1995 08 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $49 $76 Implemented
OK0457 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $199 $240 Implemented