IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

435

matching recommendations
Reset
SIC 2033 Canned Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0582 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,257 $45,587 Implemented
SF0582 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,094 $17,764 Implemented
SF0582 # 09 Y:2022 09 2022 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $3,070 $11,782 Implemented
SF0582 # 03 Y:2022 03 2022 INSTALL / REPAIR INSULATION ON STEAM LINES $29,881 $2,290 Implemented
SF0582 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,960 $0 Implemented
SF0582 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,836 $41,117 Implemented
SF0582 # 04 Y:2022 04 2022 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $10,294 $2,290 Implemented
SF0582 # 02 Y:2022 02 2022 MODIFY STARTUP/SHUTDOWN TIMES $7,144 $0 Implemented
UD1010 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $299 $0 Implemented
UD1010 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,598 $500 Implemented
UD1010 # 05 Y:2020 05 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,001 $60,000 Implemented
UD1010 # 06 Y:2020 06 2020 REPAIR OR REPLACE STEAM TRAPS $483 $5,500 Implemented
UD1010 # 10 Y:2020 10 2020 REDESIGN PROCESS $3,722 $43,500 Implemented
LS1915 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,228 $1,974 Implemented
LE0476 # 01 Y:2019 01 2019 ADJUST VENTS TO MINIMIZE ENERGY USE $43,794 $0 Implemented
LE0476 # 02 Y:2019 02 2019 REPAIR OR REPLACE STEAM TRAPS $19,944 $1,143 Implemented
LE0476 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $96,090 $12,000 Implemented
TR0002 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $187 $55 Implemented
TR0002 # 05 Y:2017 05 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,329 $60 Implemented
TR0002 # 06 Y:2017 06 2017 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,204 $0 Implemented
TR0002 # 01 Y:2017 01 2017 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $30,725 $22,000 Implemented
TR0002 # 02 Y:2017 02 2017 USE OPTIMUM THICKNESS INSULATION $6,968 $500 Implemented
BS0079 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $154 $148 Implemented
SF0486 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $833 $0 Implemented
SF0486 # 04 Y:2016 04 2016 UPGRADE CONTROLS ON COMPRESSORS $60,071 $20,763 Implemented