IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
SIC 2033 Canned Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0503 # 06 Y:2006 06 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $5,341 $600 Implemented
OR0503 # 05 Y:2006 05 2006 MAXIMIZE PRODUCTION RUNS TO REDUCE CLEANING $46,500 $0 Implemented
OR0503 # 04 Y:2006 04 2006 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $50,800 $11,300 Implemented
OR0503 # 03 Y:2006 03 2006 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $17,800 $36,000 Implemented
OR0503 # 01 Y:2006 01 2006 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $37,500 $42,500 Implemented
OR0382 # 06 Y:2000 06 2000 ELIMINATE A BY-PRODUCT $68,235 $2,000 Implemented
OR0382 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,208 $26,491 Implemented
OR0382 # 01 Y:2000 01 2000 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $26,817 $900 Implemented
OR0381 # 01 Y:2000 01 2000 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM $27,260 $0 Implemented
OR0381 # 02 Y:2000 02 2000 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $699 $300 Implemented
OR0381 # 04 Y:2000 04 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,850 $8,600 Implemented
OR0381 # 05 Y:2000 05 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,096 $390 Implemented
OR0284 # 03 Y:1996 03 1996 INSULATE FEEDWATER TANK $291 $155 Implemented
OR0284 # 02 Y:1996 02 1996 INSTALL / REPAIR INSULATION ON STEAM LINES $1,074 $516 Implemented
OR0284 # 01 Y:1996 01 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $35,224 $10,450 Implemented
OR0283 # 07 Y:1996 07 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,032 $29,713 Implemented
OR0283 # 02 Y:1996 02 1996 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $715 $1,566 Implemented
OR0283 # 01 Y:1996 01 1996 USE MINIMUM STEAM OPERATING PRESSURE $1,474 $0 Implemented
OR0243 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $278 $796 Implemented
OR0243 # 02 Y:1995 02 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,093 $500 Implemented
OR0243 # 01 Y:1995 01 1995 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $20,308 $0 Implemented
OR0184 # 01 Y:1993 01 1993 KEEP BOILER TUBES CLEAN $3,632 $500 Implemented
OR0184 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $395 $1,090 Implemented
OR0184 # 02 Y:1993 02 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $5,103 $2,385 Implemented
OR0164 # 05 Y:1992 05 1992 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,127 $4,466 Implemented