Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsSIC | 2035 | Pickles, Sauces, And Salad Dressings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0556 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,320 | $2,320 | Implemented |
OR0556 # 05 Y:2010 | 05 | 2010 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $3,131 | $2,861 | Implemented |
OR0556 # 03 Y:2010 | 03 | 2010 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $8,900 | $8,900 | Implemented |
OR0556 # 01 Y:2010 | 01 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $542 | $0 | Implemented |
OR0475 # 06 Y:2005 | 06 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,920 | $0 | Implemented |
OR0475 # 02 Y:2005 | 02 | 2005 | AVOID FROST FORMATION ON EVAPORATORS | $6,600 | $1,500 | Implemented |
OR0467 # 03 Y:2004 | 03 | 2004 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,000 | $31,500 | Implemented |
OR0360 # 05 Y:1999 | 05 | 1999 | SELL / OFFER BY-PRODUCT AS ANIMAL FEED | $17,520 | $2,000 | Implemented |
OR0360 # 02 Y:1999 | 02 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,909 | $0 | Implemented |
OR0360 # 01 Y:1999 | 01 | 1999 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $9,585 | $2,840 | Implemented |
OR0286 # 01 Y:1997 | 01 | 1997 | BURN WOOD BY-PRODUCTS FOR HEAT | $907 | $0 | Implemented |
OR0285 # 05 Y:1996 | 05 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,671 | $15,663 | Implemented |
OR0285 # 03 Y:1996 | 03 | 1996 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $36,382 | $10,450 | Implemented |
OR0285 # 02 Y:1996 | 02 | 1996 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $464 | $142 | Implemented |
OR0285 # 01 Y:1996 | 01 | 1996 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $33,432 | $0 | Implemented |
OR0261 # 05 Y:1996 | 05 | 1996 | UTILIZE OXIDATION/REDUCTION FOR NEUTRALIZATION | $92,431 | $120,000 | Implemented |
OR0261 # 03 Y:1996 | 03 | 1996 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $1,824 | $4,012 | Implemented |
OR0261 # 02 Y:1996 | 02 | 1996 | INSULATE FEEDWATER TANK | $1,450 | $2,383 | Implemented |
OR0080 # 05 Y:1990 | 05 | 1990 | INSTALL SET-BACK TIMERS | $569 | $660 | Implemented |
OR0080 # 04 Y:1990 | 04 | 1990 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,957 | $0 | Implemented |
OR0080 # 03 Y:1990 | 03 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,590 | $1,500 | Implemented |
OR0080 # 01 Y:1990 | 01 | 1990 | REDUCE VENTILATION AIR | $5,914 | $0 | Implemented |
OR0051 # 06 Y:1989 | 06 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $467 | $503 | Implemented |
OR0051 # 05 Y:1989 | 05 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $444 | $500 | Implemented |
OR0051 # 04 Y:1989 | 04 | 1989 | INSTALL STEAM TRAP | $23,375 | $2,335 | Implemented |