IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 2035 Pickles, Sauces, And Salad Dressings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0556 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,320 $2,320 Implemented
OR0556 # 05 Y:2010 05 2010 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,131 $2,861 Implemented
OR0556 # 03 Y:2010 03 2010 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $8,900 $8,900 Implemented
OR0556 # 01 Y:2010 01 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $542 $0 Implemented
OR0475 # 06 Y:2005 06 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,920 $0 Implemented
OR0475 # 02 Y:2005 02 2005 AVOID FROST FORMATION ON EVAPORATORS $6,600 $1,500 Implemented
OR0467 # 03 Y:2004 03 2004 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,000 $31,500 Implemented
OR0360 # 05 Y:1999 05 1999 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $17,520 $2,000 Implemented
OR0360 # 02 Y:1999 02 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,909 $0 Implemented
OR0360 # 01 Y:1999 01 1999 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $9,585 $2,840 Implemented
OR0286 # 01 Y:1997 01 1997 BURN WOOD BY-PRODUCTS FOR HEAT $907 $0 Implemented
OR0285 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,671 $15,663 Implemented
OR0285 # 03 Y:1996 03 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $36,382 $10,450 Implemented
OR0285 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $464 $142 Implemented
OR0285 # 01 Y:1996 01 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $33,432 $0 Implemented
OR0261 # 05 Y:1996 05 1996 UTILIZE OXIDATION/REDUCTION FOR NEUTRALIZATION $92,431 $120,000 Implemented
OR0261 # 03 Y:1996 03 1996 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,824 $4,012 Implemented
OR0261 # 02 Y:1996 02 1996 INSULATE FEEDWATER TANK $1,450 $2,383 Implemented
OR0080 # 05 Y:1990 05 1990 INSTALL SET-BACK TIMERS $569 $660 Implemented
OR0080 # 04 Y:1990 04 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,957 $0 Implemented
OR0080 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,590 $1,500 Implemented
OR0080 # 01 Y:1990 01 1990 REDUCE VENTILATION AIR $5,914 $0 Implemented
OR0051 # 06 Y:1989 06 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $467 $503 Implemented
OR0051 # 05 Y:1989 05 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $444 $500 Implemented
OR0051 # 04 Y:1989 04 1989 INSTALL STEAM TRAP $23,375 $2,335 Implemented