IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

172

matching recommendations
Reset
SIC 2038 Frozen Specialties, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0044 # 08 Y:2009 08 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,476 $4,900 Implemented
TT0041 # 01 Y:2009 01 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,330 $0 Implemented
TT0041 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,503 $0 Implemented
TT0041 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,050 $0 Implemented
GT0832 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,160 $1,250 Implemented
GT0832 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,559 $45,000 Implemented
GT0832 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,105 $0 Implemented
GT0832 # 07 Y:2006 07 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $43,862 $20,449 Implemented
GT0832 # 09 Y:2006 09 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,862 $47,168 Implemented
LM0108 # 03 Y:2006 03 2006 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $287,197 $0 Implemented
LM0108 # 04 Y:2006 04 2006 SCHEDULE DELIVERIES ACCORDING TO DEMAND $16,460 $0 Implemented
LM0108 # 05 Y:2006 05 2006 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $184,119 $15,120 Implemented
OK0701 # 01 Y:2005 01 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $11,182 $123,420 Implemented
OK0701 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $43,354 $1,623 Implemented
OK0701 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,396 $8,850 Implemented
OK0695 # 04 Y:2004 04 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,723 $21,750 Implemented
OK0695 # 06 Y:2004 06 2004 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $6,830 $0 Implemented
IC0079 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $522 $400 Implemented
IC0079 # 04 Y:2004 04 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $311 $224 Implemented
IC0079 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,244 $18,858 Implemented
IC0079 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $2,248 $9,540 Implemented
IC0079 # 08 Y:2004 08 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,734 $0 Implemented
IC0079 # 09 Y:2004 09 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,159,243 $6,681,290 Implemented
MI0079 # 05 Y:2004 05 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $138,625 $68,380 Implemented
BD0175 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $4,078 $2,850 Implemented