Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,146
matching recommendationsSIC | 205 | Bakery Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0591 # 04 Y:2023 | 04 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $27,896 | $8,591 | Implemented |
UF0591 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,481 | $66,747 | Implemented |
UF0591 # 05 Y:2023 | 05 | 2023 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $12,470 | $19,320 | Implemented |
UF0591 # 02 Y:2023 | 02 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $48,128 | $44,635 | Implemented |
GT0964 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $18,786 | $50,570 | Implemented |
GT0964 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $78,169 | $1,850 | Implemented |
UF0591 # 07 Y:2023 | 07 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,713 | $0 | Implemented |
UF0590 # 03 Y:2023 | 03 | 2023 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $16,705 | $11,574 | Implemented |
UF0590 # 06 Y:2023 | 06 | 2023 | INSTALL SUB-METERING EQUIPMENT | $10,106 | $11,100 | Implemented |
UF0590 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $90,544 | $67,849 | Implemented |
UF0590 # 04 Y:2023 | 04 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $31,115 | $12,420 | Implemented |
UF0590 # 07 Y:2023 | 07 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $3,034 | $528 | Implemented |
UF0590 # 08 Y:2023 | 08 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $79,607 | $10,000 | Implemented |
UF0590 # 05 Y:2023 | 05 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,955 | $25,440 | Implemented |
OR0768 # 01 Y:2023 | 01 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $18,535 | $8,125 | Implemented |
OR0768 # 03 Y:2023 | 03 | 2023 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $11,178 | $5,693 | Implemented |
UA0267 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $677 | $901 | Implemented |
UA0267 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,033 | $1,000 | Implemented |
UA0267 # 03 Y:2022 | 03 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $2,954 | $1,360 | Implemented |
TT0291 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $41,378 | $10,100 | Implemented |
TT0291 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,663 | $1,500 | Implemented |
SF0595 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,280 | $7,191 | Implemented |
SF0595 # 02 Y:2023 | 02 | 2023 | USE OPTIMUM THICKNESS INSULATION | $2,174 | $1,800 | Implemented |
SF0595 # 01 Y:2023 | 01 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,809 | $1,487 | Implemented |
SF0595 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,469 | $5,620 | Implemented |