IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0267 # 03 Y:2022 03 2022 INSTALL TIMERS AND/OR THERMOSTATS $2,954 $1,360 Implemented
UA0267 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,033 $1,000 Implemented
UA0267 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $677 $901 Implemented
AS0534 # 01 Y:2022 01 2022 CONTRACT A WOOD PALLET RECYCLING COMPANY $20,000 $450 Implemented
AS0534 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,218 $1,951 Implemented
MA0841 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $253 $234 Implemented
MA0841 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $24,631 $155,407 Implemented
MA0841 # 01 Y:2022 01 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,138 $8,830 Implemented
MA0841 # 04 Y:2022 04 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,842 $500 Implemented
MA0841 # 03 Y:2022 03 2022 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $9,761 $49,341 Implemented
AS0521 # 01 Y:2022 01 2022 CONTRACT A WOOD PALLET RECYCLING COMPANY $52,178 $1,517 Implemented
AS0521 # 06 Y:2022 06 2022 USE OPTIMUM THICKNESS INSULATION $13 $109 Implemented
AS0521 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $191 $514 Implemented
AS0521 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $835 $814 Implemented
AS0521 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,344 $6,500 Implemented
MA0835 # 04 Y:2022 04 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $680 $750 Implemented
MA0835 # 02 Y:2022 02 2022 USE HEAT PUMP FOR SPACE CONDITIONING $2,773 $7,150 Implemented
MA0835 # 01 Y:2022 01 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,572 $40,722 Implemented
MA0836 # 03 Y:2022 03 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $9,895 $23,950 Implemented
MA0836 # 05 Y:2022 05 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,531 $1,500 Implemented
MA0836 # 06 Y:2022 06 2022 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $7,372 $500 Implemented
MA0836 # 07 Y:2022 07 2022 USE HEAT PUMP FOR SPACE CONDITIONING $2,777 $7,150 Implemented
MA0836 # 08 Y:2022 08 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,781 $625 Implemented
LS2215 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $247 $100 Implemented
LS2215 # 07 Y:2022 07 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $49,680 $58,020 Implemented