IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,523

matching recommendations
Reset
SIC 208 Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0364 # 01 Y:2000 01 2000 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $8,700 $600 Implemented
SD0237 # 01 Y:2000 01 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $28,985 $88,000 Implemented
SD0237 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,408 $2,800 Implemented
SD0237 # 03 Y:2000 03 2000 REDUCE EXCESSIVE BOILER BLOWDOWN $688 $100 Implemented
SD0237 # 07 Y:2000 07 2000 MINIMIZE WATER USAGE $646 $100 Implemented
SD0237 # 08 Y:2000 08 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $40,972 $7,200 Implemented
UL0233 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,210 $50 Implemented
UL0233 # 04 Y:1999 04 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,027 $4,475 Implemented
UL0233 # 05 Y:1999 05 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $7,011 $9,500 Implemented
UD0572 # 02 Y:1999 02 1999 USE PLASTIC PALLETS INSTEAD OF WOOD $38,960 $110,457 Implemented
UD0572 # 04 Y:1999 04 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $9,457 $-27,115 Implemented
KU0514 # 01 Y:1999 01 1999 USE OPTIMUM TEMPERATURE $25,150 $9,360 Implemented
KU0514 # 03 Y:1999 03 1999 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $2,250 $280 Implemented
KU0514 # 06 Y:1999 06 1999 INSULATE BARE EQUIPMENT $1,120 $860 Implemented
KU0514 # 07 Y:1999 07 1999 MINIMIZE WATER USAGE $12,240 $22,300 Implemented
KU0514 # 09 Y:1999 09 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $490 $260 Implemented
KU0514 # 10 Y:1999 10 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $106,720 $288,000 Implemented
UF0223 # 06 Y:1999 06 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $28,563 $100,600 Implemented
UF0223 # 05 Y:1999 05 1999 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $2,250 $0 Implemented
UF0223 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,583 $9,021 Implemented
UF0223 # 03 Y:1999 03 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $654 $0 Implemented
UF0223 # 02 Y:1999 02 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,615 $50 Implemented
AM0346 # 01 Y:1999 01 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $18,650 $8,000 Implemented
AM0346 # 02 Y:1999 02 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,300 $15,000 Implemented
AM0346 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $390 $200 Implemented