IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,566

matching recommendations
Reset
SIC 208 Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0298 # 09 Y:2002 09 2002 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $18,976 $50 Implemented
UF0291 # 01 Y:2002 01 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,755 $1,050 Implemented
UF0291 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,917 $6,752 Implemented
UF0291 # 04 Y:2002 04 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $22,067 $40,280 Implemented
UF0291 # 05 Y:2002 05 2002 REPAIR AND ELIMINATE STEAM LEAKS $1,124 $450 Implemented
UF0291 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,424 $490 Implemented
UF0291 # 07 Y:2002 07 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,235 $25,190 Implemented
UF0291 # 11 Y:2002 11 2002 MOVE BOILER TO MORE EFFICIENT LOCATION $4,387 $0 Implemented
UF0291 # 12 Y:2002 12 2002 METER WASTE WATER $4,133 $1,500 Implemented
LL0123 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,416 $1,740 Implemented
LL0123 # 02 Y:2001 02 2001 INSULATE BARE EQUIPMENT $2,174 $1,308 Implemented
LL0123 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $1,389 $2,686 Implemented
LL0123 # 06 Y:2001 06 2001 USE PHOTOCELL CONTROLS $3,349 $333 Implemented
LL0123 # 07 Y:2001 07 2001 DISCONNECT BALLASTS $909 $0 Implemented
SU0107 # 01 Y:2001 01 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,945 $750 Implemented
SU0107 # 02 Y:2001 02 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $410 $390 Implemented
SU0107 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $170 $59 Implemented
SU0107 # 04 Y:2001 04 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $50 $20 Implemented
SU0107 # 05 Y:2001 05 2001 PAY UTILITY BILLS ON TIME $44 $0 Implemented
MI0014 # 03 Y:2001 03 2001 MODIFY STARTUP/SHUTDOWN TIMES $9,086 $867 Implemented
MI0014 # 05 Y:2001 05 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $661 $5 Implemented
MI0014 # 06 Y:2001 06 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,056 $20 Implemented
MI0014 # 07 Y:2001 07 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,454 $80 Implemented
LE0115 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $993 $200 Implemented
LE0115 # 04 Y:2001 04 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,572 $0 Implemented