IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

262

matching recommendations
Reset
SIC 2082 Malt Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0352 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,454 $0 Implemented
UM0352 # 08 Y:2009 08 2009 INSTALL OCCUPANCY SENSORS $504 $920 Implemented
UM0352 # 09 Y:2009 09 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,944 $1,200 Implemented
DL0015 # 02 Y:2008 02 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,400 $3,500 Implemented
DL0015 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,500 $20,000 Implemented
DL0015 # 04 Y:2008 04 2008 ADD AREA LIGHTING SWITCHES $370 $1,500 Implemented
DL0015 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $5,911 $2,500 Implemented
DL0015 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,249 $18,000 Implemented
NC0344 # 02 Y:2006 02 2006 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $460,800 $118,971 Implemented
NC0344 # 04 Y:2006 04 2006 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $62,722 $50,000 Implemented
NC0344 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,686 $4,423 Implemented
UF0369 # 01 Y:2005 01 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,002 $2,082 Implemented
UF0369 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,073 $460 Implemented
UF0369 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $21,928 $477 Implemented
UF0369 # 04 Y:2005 04 2005 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $0 $24,800 Implemented
LL0178 # 01 Y:2003 01 2003 PAY BILLS ON TIME TO AVOID LATE FEES $2,891 $30 Implemented
LL0178 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,005 $15 Implemented
LL0178 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $898 $440 Implemented
LL0178 # 06 Y:2003 06 2003 USE PHOTOCELL CONTROLS $253 $56 Implemented
LL0178 # 07 Y:2003 07 2003 INSULATE BARE EQUIPMENT $55 $98 Implemented
SU0107 # 01 Y:2001 01 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,945 $750 Implemented
SU0107 # 02 Y:2001 02 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $410 $390 Implemented
SU0107 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $170 $59 Implemented
SU0107 # 04 Y:2001 04 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $50 $20 Implemented
SU0107 # 05 Y:2001 05 2001 PAY UTILITY BILLS ON TIME $44 $0 Implemented