Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsSIC | 2092 | Fresh Or Frozen Prepared Fish |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0359 # 02 Y:1999 | 02 | 1999 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,013 | $0 | Implemented |
OR0358 # 04 Y:1999 | 04 | 1999 | ELIMINATE A BY-PRODUCT | $9,905 | $2,000 | Implemented |
OR0357 # 05 Y:1999 | 05 | 1999 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $7,150 | $0 | Implemented |
OR0357 # 06 Y:1999 | 06 | 1999 | OPTIMIZE PLANT POWER FACTOR | $1,621 | $4,800 | Implemented |
ORS005 # 10 Y:1999 | 10 | 1999 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $0 | $490 | Implemented |
ORS005 # 09 Y:1999 | 09 | 1999 | $310,000 | $69,000 | Implemented | |
ORS005 # 05 Y:1999 | 05 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,920 | $700 | Implemented |
ORS005 # 04 Y:1999 | 04 | 1999 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $18,500 | $40,000 | Implemented |
ORS005 # 03 Y:1999 | 03 | 1999 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $55,755 | $0 | Implemented |
ORS005 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $23,531 | $41,296 | Implemented |
ORS003 # 09 Y:1999 | 09 | 1999 | $80,220 | $15,400 | Implemented | |
ORS003 # 08 Y:1999 | 08 | 1999 | USE OTHER WASTE CONCENTRATION METHODS | $39,020 | $34,600 | Implemented |
ORS003 # 05 Y:1999 | 05 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,140 | $700 | Implemented |
ORS003 # 02 Y:1999 | 02 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,492 | $7,459 | Implemented |
ORS003 # 03 Y:1999 | 03 | 1999 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $39,677 | $20,000 | Implemented |
ORS002 # 05 Y:1999 | 05 | 1999 | $166,000 | $121,000 | Implemented | |
ORS002 # 08 Y:1999 | 08 | 1999 | REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING | $5,954 | $0 | Implemented |
ORS002 # 04 Y:1999 | 04 | 1999 | REPLACE BOILER | $12,100 | $0 | Implemented |
ORS002 # 03 Y:1999 | 03 | 1999 | INSTALL / REPAIR INSULATION ON STEAM LINES | $880 | $700 | Implemented |
ORS002 # 02 Y:1999 | 02 | 1999 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,055 | $15,400 | Implemented |
ORS002 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,472 | $27,939 | Implemented |
OR0354 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $661 | $2,049 | Implemented |
OR0354 # 03 Y:1999 | 03 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $750 | $500 | Implemented |
OR0354 # 01 Y:1999 | 01 | 1999 | CLOSE OFF UNNEEDED STEAM LINES | $5,250 | $950 | Implemented |
OR0351 # 03 Y:1999 | 03 | 1999 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,590 | $0 | Implemented |