IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

127

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0932 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $899 $1,117 Implemented
GT0932 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $495 $382 Implemented
GT0932 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $4,768 $5,877 Implemented
GT0932 # 01 Y:2019 01 2019 REPAIR AND ELIMINATE STEAM LEAKS $2,019 $500 Implemented
CL1804 # 01 Y:2018 01 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $156,853 $28,500 Implemented
CL1804 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,306 $184,601 Implemented
CL1804 # 04 Y:2018 04 2018 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $39,409 $3,050 Implemented
NC0566 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,988 $100 Implemented
NC0566 # 11 Y:2016 11 2016 DEVELOP A REPAIR/REPLACE POLICY $4,453 $4,256 Implemented
NC0566 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54,183 $44,349 Implemented
NC0566 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $231,779 $419,073 Implemented
NC0566 # 09 Y:2016 09 2016 REPAIR AND ELIMINATE STEAM LEAKS $2,230 $1,000 Implemented
NC0566 # 12 Y:2016 12 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,706 $230 Implemented
NC0566 # 10 Y:2016 10 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,287 $2,000 Implemented
NC0566 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $788 $200 Implemented
NC0566 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,757 $5,000 Implemented
GT0796 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $895 $200 Implemented
GT0796 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,051 $50,551 Implemented
GT0796 # 03 Y:2004 03 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $835 $0 Implemented
NC0274 # 05 Y:2003 05 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,021 $1,000 Implemented
NC0274 # 03 Y:2003 03 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,209 $200 Implemented
GT0708 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,765 $0 Implemented
GT0708 # 04 Y:2001 04 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $38,843 $13,500 Implemented
GT0708 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,650 $21,400 Implemented
GT0708 # 01 Y:2001 01 2001 MOVE BOILER TO MORE EFFICIENT LOCATION $7,140 $0 Implemented