IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

114

matching recommendations
Reset
SIC 2269 Finishing Plants, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0052 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,040 $720 Implemented
DL0052 # 07 Y:2010 07 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,560 $200 Implemented
DL0052 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $3,810 $560 Implemented
DL0052 # 05 Y:2010 05 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,940 $1,500 Implemented
SU0278 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $44,212 $7,299 Implemented
SU0278 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,615 $410 Implemented
SU0278 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,049 $6,721 Implemented
SU0278 # 10 Y:2009 10 2009 OPTIMIZE PLANT POWER FACTOR $7,344 $28,458 Implemented
SU0278 # 04 Y:2009 04 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,305 $528 Implemented
SU0278 # 01 Y:2009 01 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $25,359 $0 Implemented
SU0278 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,050 $0 Implemented
GT0743 # 01 Y:2002 01 2002 USE MINIMUM STEAM OPERATING PRESSURE $1,259 $0 Implemented
GT0743 # 04 Y:2002 04 2002 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $10,781 $1,720 Implemented
NC0225 # 08 Y:2001 08 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,105 $100,000 Implemented
NC0225 # 04 Y:2001 04 2001 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS $15,365 $5,000 Implemented
NC0225 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,625 $33,848 Implemented
NC0225 # 06 Y:2001 06 2001 KEEP BOILER TUBES CLEAN $3,649 $13,000 Implemented
NC0225 # 01 Y:2001 01 2001 DEVELOP A REPAIR/REPLACE POLICY $2,783 $1,895 Implemented
NC0225 # 07 Y:2001 07 2001 REPAIR AND ELIMINATE STEAM LEAKS $8,655 $3,500 Implemented
GT0708 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,650 $21,400 Implemented
GT0708 # 06 Y:2001 06 2001 REPAIR OR REPLACE STEAM TRAPS $9,164 $10,500 Implemented
GT0708 # 04 Y:2001 04 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $38,843 $13,500 Implemented
GT0708 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,765 $0 Implemented
GT0708 # 01 Y:2001 01 2001 MOVE BOILER TO MORE EFFICIENT LOCATION $7,140 $0 Implemented
NC0204 # 07 Y:2000 07 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,074 $1,000 Implemented