IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

114

matching recommendations
Reset
SIC 2269 Finishing Plants, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0204 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,133 $257 Implemented
NC0204 # 03 Y:2000 03 2000 DISCONNECT BALLASTS $2,900 $6,800 Implemented
NC0204 # 05 Y:2000 05 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,960 $730 Implemented
NC0204 # 06 Y:2000 06 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,422 $1,100 Implemented
NC0204 # 07 Y:2000 07 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,074 $1,000 Implemented
NC0204 # 09 Y:2000 09 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $421 $90 Implemented
NC0204 # 11 Y:2000 11 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $375 $500 Implemented
GT0667 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $162 $50 Implemented
GT0667 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,292 $18,568 Implemented
HO0171 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,021 $5,131 Implemented
HO0171 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,188 $50 Implemented
HO0171 # 08 Y:1998 08 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $64,007 $2,200 Implemented
HO0171 # 09 Y:1998 09 1998 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,116 $1,000 Implemented
NC0129 # 02 Y:1997 02 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,492 $1,000 Implemented
NC0129 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,287 $1,678 Implemented
NC0129 # 05 Y:1997 05 1997 BURN A LESS EXPENSIVE GRADE OF FUEL $29,900 $200 Implemented
HO0132 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $688 $937 Implemented
HO0132 # 04 Y:1996 04 1996 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,949 $13,764 Implemented
HO0132 # 07 Y:1996 07 1996 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $72,300 $287,000 Implemented
TN0580 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,167 $5,110 Implemented
TN0580 # 03 Y:1996 03 1996 INSTALL TIMERS AND/OR THERMOSTATS $3,848 $520 Implemented
NC0051 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,978 $420 Implemented
NC0051 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,438 $4,430 Implemented
NC0051 # 07 Y:1995 07 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,190 $0 Implemented
MA0237 # 01 Y:1992 01 1992 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $19,462 $200 Implemented