IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

436

matching recommendations
Reset
SIC 229 Miscellaneous Textile Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0157 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $430 $1,520 Implemented
MA0742 # 02 Y:2015 02 2015 OPTIMIZE PLANT POWER FACTOR $38,357 $25,972 Implemented
MA0742 # 03 Y:2015 03 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $24,583 $5,560 Implemented
MA0742 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $8,116 $9,000 Implemented
MA0742 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,465 $11,685 Implemented
MA0742 # 08 Y:2015 08 2015 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,024 $11,650 Implemented
NC0510 # 01 Y:2014 01 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $55,430 $1,200 Implemented
NC0510 # 03 Y:2014 03 2014 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $1,500 $1,000 Implemented
NC0510 # 05 Y:2014 05 2014 REPAIR OR REPLACE STEAM TRAPS $26,718 $67,500 Implemented
NC0510 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,422 $100 Implemented
NC0510 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $1,444 $2,082 Implemented
NC0510 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $943 $1,993 Implemented
NC0510 # 10 Y:2014 10 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $811 $3,523 Implemented
NC0510 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $836 $240 Implemented
DL0116 # 02 Y:2013 02 2013 INSTALL TIMERS AND/OR THERMOSTATS $5,700 $20 Implemented
DL0116 # 06 Y:2013 06 2013 REPAIR AND ELIMINATE STEAM LEAKS $3,323 $4,000 Implemented
DL0116 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,226 $12,000 Implemented
DL0116 # 12 Y:2013 12 2013 INSULATE BARE EQUIPMENT $596 $500 Implemented
MA0671 # 02 Y:2011 02 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $4,780 $3,550 Implemented
MA0671 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $740 $200 Implemented
AM0583 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,970 $26,490 Implemented
AM0583 # 05 Y:2010 05 2010 PAY UTILITY BILLS ON TIME $479 $0 Implemented
AM0583 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $210 $10 Implemented
AM0583 # 07 Y:2010 07 2010 USE SYNTHETIC LUBRICANT $130 $0 Implemented
AM0583 # 02 Y:2010 02 2010 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,360 $0 Implemented