IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,196

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0577 # 03 Y:1996 03 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,249 $0 Implemented
TN0577 # 04 Y:1996 04 1996 REPAIR AND ELIMINATE STEAM LEAKS $342 $80 Implemented
TN0577 # 05 Y:1996 05 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $142 $0 Implemented
MS0054 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,116 $10,500 Implemented
MS0054 # 03 Y:1996 03 1996 IMPROVE LUBRICATION PRACTICES $1,076 $150 Implemented
TN0572 # 02 Y:1996 02 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $13,909 $15,800 Implemented
TN0572 # 03 Y:1996 03 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,987 $0 Implemented
TN0572 # 05 Y:1996 05 1996 INSULATE BARE EQUIPMENT $1,469 $1,548 Implemented
TN0572 # 06 Y:1996 06 1996 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $454 $472 Implemented
TN0572 # 07 Y:1996 07 1996 INSULATE BARE EQUIPMENT $337 $286 Implemented
KG0058 # 01 Y:1996 01 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,449 $16,500 Implemented
KG0058 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,585 $6,796 Implemented
KG0058 # 05 Y:1996 05 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,022 $12,000 Implemented
KG0058 # 06 Y:1996 06 1996 USE SYNTHETIC LUBRICANT $2,937 $0 Implemented
KG0058 # 07 Y:1996 07 1996 RECOVER AND REUSE WASTE MATERIAL $8,771 $0 Implemented
KG0058 # 08 Y:1996 08 1996 RECOVER AND REUSE WASTE MATERIAL $4,456 $1,500 Implemented
MS0043 # 03 Y:1995 03 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $221 $0 Implemented
MS0043 # 04 Y:1995 04 1995 REDUCE VENTILATION AIR $305 $240 Implemented
MO0165 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,744 $3,350 Implemented
MO0165 # 04 Y:1995 04 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,357 $500 Implemented
MO0165 # 05 Y:1995 05 1995 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $1,460 $775 Implemented
MO0165 # 10 Y:1995 10 1995 TREAT AND REUSE RINSE WATERS $1,400 $1,450 Implemented
MO0163 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,010 $2,215 Implemented
MO0163 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $46 $0 Implemented
MO0163 # 06 Y:1995 06 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,292 $138 Implemented