IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,196

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0381 # 05 Y:2008 05 2008 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $998 $500 Implemented
NC0381 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,016 $100 Implemented
LL0286 # 02 Y:2007 02 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,092 $696 Implemented
LL0286 # 04 Y:2007 04 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,927 $90 Implemented
LL0286 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,588 $920 Implemented
LL0286 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,534 $30 Implemented
LL0286 # 08 Y:2007 08 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $519 $798 Implemented
MS0292 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,743 $34,278 Implemented
MS0292 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,311 $46,268 Implemented
MS0292 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,836 $21,282 Implemented
MS0292 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,405 $231 Implemented
UU0089 # 01 Y:2005 01 2005 OPTIMIZE PLANT POWER FACTOR $1,110 $4,290 Implemented
UU0089 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,700 $2,000 Implemented
NC0328 # 05 Y:2005 05 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $11,954 $480 Implemented
NC0328 # 06 Y:2005 06 2005 USE PHOTOCELL CONTROLS $115 $165 Implemented
UU0090 # 01 Y:2005 01 2005 AIR CONDITION ONLY SPACE NECESSARY $11,500 $225 Implemented
LL0229 # 03 Y:2005 03 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,224 $170 Implemented
LL0229 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,236 $735 Implemented
LL0229 # 06 Y:2005 06 2005 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,000 $25 Implemented
MA0580 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,371 $34,720 Implemented
MA0580 # 04 Y:2005 04 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,798 $1,375 Implemented
MA0580 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,905 $0 Implemented
NC0304 # 02 Y:2004 02 2004 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $27,494 $13,050 Implemented
NC0304 # 03 Y:2004 03 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $20,008 $3,000 Implemented
NC0304 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,821 $400 Implemented