IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

171

matching recommendations
Reset
SIC 2436 Softwood Veneer And Plywood
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0761 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,913 $1,078 Implemented
OR0761 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,934 $9,934 Implemented
UA0260 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $90,617 $35,347 Implemented
UA0260 # 02 Y:2022 02 2022 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,710 $1,651 Implemented
UA0259 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $50,082 $26,090 Implemented
UA0259 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $27,827 $1,000 Implemented
OR0727 # 04 Y:2019 04 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,255 $770 Implemented
OR0727 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,870 $19,006 Implemented
NC0532 # 08 Y:2015 08 2015 REPAIR AND ELIMINATE STEAM LEAKS $990 $450 Implemented
NC0532 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $773 $240 Implemented
NC0532 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $353 $438 Implemented
NC0532 # 05 Y:2015 05 2015 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $18,636 $45,000 Implemented
NC0532 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,143 $73,960 Implemented
NC0532 # 07 Y:2015 07 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $1,753 $1,620 Implemented
OR0623 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $6,693 $1,500 Implemented
NC0463 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,015 $1,124 Implemented
NC0463 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $4,367 $5,000 Implemented
NC0463 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,208 $200 Implemented
NC0463 # 02 Y:2012 02 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,159 $1,400 Implemented
OR0567 # 01 Y:2011 01 2011 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $2,000 $1,510 Implemented
OR0567 # 05 Y:2011 05 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,000 $5,580 Implemented
OR0567 # 06 Y:2011 06 2011 INSULATE BARE EQUIPMENT $1,248 $2,547 Implemented
MS0359 # 02 Y:2010 02 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,253 $1,635 Implemented
MS0359 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,778 $241 Implemented
OR0551 # 05 Y:2009 05 2009 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $83,890 $100,800 Implemented