Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
103
matching recommendationsSIC | 2436 | Softwood Veneer And Plywood |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0761 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,934 | $9,934 | Implemented |
OR0761 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,913 | $1,078 | Implemented |
OR0727 # 04 Y:2019 | 04 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,255 | $770 | Implemented |
OR0727 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,870 | $19,006 | Implemented |
OR0567 # 06 Y:2011 | 06 | 2011 | INSULATE BARE EQUIPMENT | $1,248 | $2,547 | Implemented |
OR0567 # 05 Y:2011 | 05 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $12,000 | $5,580 | Implemented |
OR0567 # 01 Y:2011 | 01 | 2011 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $2,000 | $1,510 | Implemented |
OR0551 # 05 Y:2009 | 05 | 2009 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $83,890 | $100,800 | Implemented |
OR0551 # 04 Y:2009 | 04 | 2009 | INSTALL OCCUPANCY SENSORS | $28,320 | $48,980 | Implemented |
OR0551 # 02 Y:2009 | 02 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $28,529 | $42,146 | Implemented |
OR0551 # 01 Y:2009 | 01 | 2009 | UPGRADE CONTROLS ON COMPRESSORS | $77,191 | $50,820 | Implemented |
OR0545 # 06 Y:2009 | 06 | 2009 | INSTALL OCCUPANCY SENSORS | $8,600 | $35,300 | Implemented |
OR0545 # 05 Y:2009 | 05 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $19,200 | $58,700 | Implemented |
OR0545 # 01 Y:2009 | 01 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $40,900 | $40,900 | Implemented |
OR0519 # 09 Y:2007 | 09 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $47,500 | $109,300 | Implemented |
OR0519 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,400 | $12,400 | Implemented |
OR0519 # 07 Y:2007 | 07 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $52,800 | $40,500 | Implemented |
OR0519 # 06 Y:2007 | 06 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $102,000 | $33,700 | Implemented |
OR0519 # 05 Y:2007 | 05 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $16,700 | $35,900 | Implemented |
OR0519 # 02 Y:2007 | 02 | 2007 | REDUCE EXCESS STEAM BLEEDING | $548,400 | $28,000 | Implemented |
OR0489 # 02 Y:2005 | 02 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,600 | $340 | Implemented |
OR0489 # 04 Y:2005 | 04 | 2005 | USE PHOTOCELL CONTROLS | $2,330 | $100 | Implemented |
OR0489 # 05 Y:2005 | 05 | 2005 | ADJUST VENTS TO MINIMIZE ENERGY USE | $24,900 | $12 | Implemented |
OR0489 # 08 Y:2005 | 08 | 2005 | INSTALL OCCUPANCY SENSORS | $1,450 | $3,590 | Implemented |
OR0489 # 07 Y:2005 | 07 | 2005 | INSULATE BARE EQUIPMENT | $1,800 | $2,100 | Implemented |