IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
SIC 245 Wood Buildings And Mobile Homes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0722 # 01 Y:2019 01 2019 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $42,047 $1,000 Implemented
OR0722 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,107 $0 Implemented
OR0722 # 02 Y:2019 02 2019 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $17,875 $0 Implemented
OR0569 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $17,900 $58,500 Implemented
OR0569 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $517 $517 Implemented
OR0569 # 02 Y:2011 02 2011 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,650 $700 Implemented
OR0569 # 01 Y:2011 01 2011 USE OPTIMUM TEMPERATURE $9,149 $450 Implemented
OR0566 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,690 $1,690 Implemented
OR0566 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $4,340 $9,990 Implemented
OR0566 # 01 Y:2011 01 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,230 $635 Implemented
OR0370 # 05 Y:2000 05 2000 $92,680 $0 Implemented
OR0370 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $2,748 $1,909 Implemented
OR0370 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,673 $2,050 Implemented
OR0370 # 02 Y:2000 02 2000 USE OPTIMUM TEMPERATURE $4,900 $650 Implemented
OR0370 # 01 Y:2000 01 2000 USE OPTIMUM TEMPERATURE $27,300 $0 Implemented
OR0366 # 05 Y:2000 05 2000 INSTALL TIMERS AND/OR THERMOSTATS $28,188 $1,410 Implemented
OR0366 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $365 $0 Implemented
OR0366 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,963 $0 Implemented
OR0365 # 03 Y:2000 03 2000 COMBINE UTILITY METERS $4,844 $9,721 Implemented
OR0365 # 04 Y:2000 04 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $35,788 $1,690 Implemented
OR0365 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,216 $4,300 Implemented
OR0333 # 01 Y:1998 01 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $19,985 $0 Implemented
OR0287 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $0 $2,000 Implemented
OR0287 # 05 Y:1997 05 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,770 $2,885 Implemented
OR0287 # 03 Y:1997 03 1997 RECOVER AND REUSE WASTE MATERIAL $480 $0 Implemented