IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,615

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0340 # 11 Y:2006 11 2006 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $20,000 $20,000 Implemented
SU0239 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,600 $0 Implemented
SU0239 # 03 Y:2006 03 2006 PAY BILLS ON TIME TO AVOID LATE FEES $1,365 $0 Implemented
SU0239 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,985 $440 Implemented
SU0239 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,248 $371 Implemented
SU0239 # 06 Y:2006 06 2006 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $84 $51 Implemented
SU0239 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,577 $5,660 Implemented
SU0239 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $223 $487 Implemented
SF0332 # 01 Y:2006 01 2006 REPAIR AND ELIMINATE STEAM LEAKS $10,511 $0 Implemented
SF0332 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $66,216 $5,557 Implemented
OK0732 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,149 $2,491 Implemented
OK0732 # 03 Y:2006 03 2006 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $18,843 $17,500 Implemented
OK0732 # 04 Y:2006 04 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,602 $1,223 Implemented
OK0732 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,800 $1,241 Implemented
OK0732 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,627 $3,627 Implemented
OK0732 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,116 $1,065 Implemented
LE0236 # 05 Y:2006 05 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $15,083 $2,500 Implemented
LL0249 # 01 Y:2006 01 2006 REPAIR AND ELIMINATE STEAM LEAKS $158,452 $8,830 Implemented
LL0249 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $111,014 $18,240 Implemented
SF0326 # 01 Y:2006 01 2006 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $29,674 $0 Implemented
SF0326 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,076 $12,276 Implemented
SF0326 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $51,157 $38,849 Implemented
MA0602 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,335 $96,992 Implemented
MA0602 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,691 $749 Implemented
MA0602 # 05 Y:2006 05 2006 INSULATE BARE EQUIPMENT $8,388 $4,050 Implemented