Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,622
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0249 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $111,014 | $18,240 | Implemented |
SF0326 # 01 Y:2006 | 01 | 2006 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $29,674 | $0 | Implemented |
SF0326 # 04 Y:2006 | 04 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,076 | $12,276 | Implemented |
SF0326 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $51,157 | $38,849 | Implemented |
MA0602 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,335 | $96,992 | Implemented |
MA0602 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,691 | $749 | Implemented |
MA0602 # 05 Y:2006 | 05 | 2006 | INSULATE BARE EQUIPMENT | $8,388 | $4,050 | Implemented |
MA0602 # 08 Y:2006 | 08 | 2006 | INSULATE BARE EQUIPMENT | $1,122 | $950 | Implemented |
UU0099 # 01 Y:2006 | 01 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,650 | $0 | Implemented |
UU0099 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,230 | $2,510 | Implemented |
MA0601 # 01 Y:2006 | 01 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $147,022 | $129,390 | Implemented |
MA0601 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,368 | $24,444 | Implemented |
MA0601 # 04 Y:2006 | 04 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,148 | $18,975 | Implemented |
MI0127 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,532 | $33,405 | Implemented |
MI0127 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,597 | $1,074 | Implemented |
MI0127 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $9,084 | $4,800 | Implemented |
MI0127 # 08 Y:2006 | 08 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,107 | $3,878 | Implemented |
IC0114 # 03 Y:2006 | 03 | 2006 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $19,000 | $63,000 | Implemented |
IC0114 # 09 Y:2006 | 09 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,414 | $65,273 | Implemented |
IC0114 # 10 Y:2006 | 10 | 2006 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,000 | $8,400 | Implemented |
IC0114 # 11 Y:2006 | 11 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,400 | $1,200 | Implemented |
IC0114 # 12 Y:2006 | 12 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $2,000 | $2,800 | Implemented |
IC0114 # 13 Y:2006 | 13 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,383 | $9,400 | Implemented |
MS0291 # 02 Y:2006 | 02 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $42,324 | $29,520 | Implemented |
MS0291 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,397 | $233 | Implemented |