IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,622

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0556 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,167 $10,200 Implemented
MA0556 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,534 $529 Implemented
MA0554 # 05 Y:2004 05 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $6,330 $8,961 Implemented
MA0554 # 06 Y:2004 06 2004 INSULATE FEEDWATER TANK $1,784 $1,300 Implemented
UM0259 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $20,415 $11,200 Implemented
UM0259 # 04 Y:2004 04 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $12,337 $7,410 Implemented
UM0259 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,545 $75,000 Implemented
UM0259 # 07 Y:2004 07 2004 UPGRADE CONTROLS ON COMPRESSORS $3,423 $1,500 Implemented
UM0259 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,205 $825 Implemented
UM0259 # 09 Y:2004 09 2004 REPAIR AND ELIMINATE STEAM LEAKS $1,893 $68 Implemented
UM0259 # 10 Y:2004 10 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,765 $200 Implemented
UM0259 # 11 Y:2004 11 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,700 $1,100 Implemented
UU0062 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,404 $790 Implemented
WV0297 # 04 Y:2004 04 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,905 $1,326 Implemented
WV0297 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,307 $108 Implemented
WV0297 # 06 Y:2004 06 2004 REPAIR AND ELIMINATE STEAM LEAKS $1,262 $1,200 Implemented
WV0297 # 07 Y:2004 07 2004 DEVELOP A REPAIR/REPLACE POLICY $1,041 $142 Implemented
WV0297 # 08 Y:2004 08 2004 REPAIR OR REPLACE STEAM TRAPS $799 $1,000 Implemented
WV0297 # 09 Y:2004 09 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $793 $94 Implemented
WV0294 # 03 Y:2004 03 2004 DEVELOP A REPAIR/REPLACE POLICY $5,704 $230 Implemented
WV0294 # 04 Y:2004 04 2004 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,247 $2,660 Implemented
WV0294 # 06 Y:2004 06 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,472 $920 Implemented
WV0294 # 07 Y:2004 07 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,431 $784 Implemented
WV0294 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,317 $215 Implemented
WV0294 # 09 Y:2004 09 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $609 $46 Implemented