IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,654

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0107 # 04 Y:2001 04 2001 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,407 $0 Implemented
LL0107 # 05 Y:2001 05 2001 RECYCLE WHITE WATER $25,896 $175,000 Implemented
MA0484 # 04 Y:2001 04 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,500 $9,500 Implemented
MA0484 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,300 $12,000 Implemented
MA0484 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,800 $51,800 Implemented
MA0484 # 08 Y:2001 08 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,700 $0 Implemented
MA0484 # 09 Y:2001 09 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,200 $0 Implemented
MA0484 # 10 Y:2001 10 2001 INSULATE FEEDWATER TANK $2,000 $3,000 Implemented
MA0482 # 09 Y:2001 09 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,040 $450 Implemented
WV0207 # 04 Y:2001 04 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $47,889 $2,760 Implemented
WV0207 # 05 Y:2001 05 2001 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $3,319 $36 Implemented
WV0207 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $536 $108 Implemented
WV0207 # 07 Y:2001 07 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,825 $54 Implemented
WV0207 # 12 Y:2001 12 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $43,495 $2,000 Implemented
WV0207 # 13 Y:2001 13 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,816 $300 Implemented
WV0207 # 14 Y:2001 14 2001 USE OPTIMUM THICKNESS INSULATION $4,005 $2,580 Implemented
WV0207 # 16 Y:2001 16 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $24,641 $1,440 Implemented
WV0207 # 17 Y:2001 17 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $397 $1,444 Implemented
WV0207 # 18 Y:2001 18 2001 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $80 $0 Implemented
WV0207 # 19 Y:2001 19 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $480 $100 Implemented
WV0207 # 20 Y:2001 20 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $18,100 $4,320 Implemented
WV0207 # 21 Y:2001 21 2001 METER WASTE WATER $13,220 $1,200 Implemented
SD0259 # 02 Y:2000 02 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,440 $40 Implemented
SF0202 # 01 Y:2000 01 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $698 $0 Implemented
SF0202 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $960 $600 Implemented