IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0727 # 03 Y:2014 03 2014 PAY UTILITY BILLS ON TIME $6,481 $500 Implemented
MA0727 # 05 Y:2014 05 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,122 $1,500 Implemented
MA0725 # 05 Y:2014 05 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $28,833 $9,690 Implemented
MA0725 # 01 Y:2014 01 2014 BURN A LESS EXPENSIVE GRADE OF FUEL $1,049,475 $2,750,000 Implemented
MA0725 # 10 Y:2014 10 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,314 $10,600 Implemented
MA0725 # 06 Y:2014 06 2014 UPGRADE CONTROLS ON COMPRESSORS $23,788 $9,000 Implemented
MA0725 # 12 Y:2014 12 2014 INSULATE BARE EQUIPMENT $3,366 $30,760 Implemented
MA0725 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,977 $12,270 Implemented
MA0642 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $251 $120 Implemented
MA0642 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,279 $27,924 Implemented
MA0566 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $5,889 $3,076 Implemented
MA0566 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $33,400 $20,000 Implemented
MA0566 # 02 Y:2004 02 2004 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $113,441 $191,180 Implemented
MA0566 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $148,951 $35,885 Implemented
MA0542 # 04 Y:2003 04 2003 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $8,465 $0 Implemented
MA0542 # 06 Y:2003 06 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,232 $500 Implemented
MA0542 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $4,383 $0 Implemented
MA0510 # 04 Y:2002 04 2002 REDUCE FLUID FLOW RATES $1,849 $0 Implemented
MA0510 # 09 Y:2002 09 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $750 $0 Implemented
MA0510 # 08 Y:2002 08 2002 USE MINIMUM STEAM OPERATING PRESSURE $960 $0 Implemented
MA0510 # 07 Y:2002 07 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,382 $0 Implemented
MA0510 # 06 Y:2002 06 2002 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,604 $1,792 Implemented
MA0510 # 05 Y:2002 05 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,619 $0 Implemented
MA0484 # 08 Y:2001 08 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,700 $0 Implemented
MA0484 # 04 Y:2001 04 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,500 $9,500 Implemented