IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

190

matching recommendations
Reset
SIC 263 Paperboard Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0396 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $10,128 $3,390 Implemented
WV0396 # 04 Y:2009 04 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $69,637 $1,000 Implemented
UM0341 # 02 Y:2008 02 2008 INSULATE BARE EQUIPMENT $79,804 $53,414 Implemented
GT0849 # 04 Y:2008 04 2008 INCREASE AMOUNT OF CONDENSATE RETURNED $292,310 $18,200 Implemented
UA0017 # 05 Y:2008 05 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $22,989 $0 Implemented
UA0017 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21,380 $0 Implemented
UA0017 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $59,923 $1,050 Implemented
UA0017 # 03 Y:2008 03 2008 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $33,016 $402 Implemented
UA0017 # 04 Y:2008 04 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $5,880 $314 Implemented
SF0332 # 01 Y:2006 01 2006 REPAIR AND ELIMINATE STEAM LEAKS $10,511 $0 Implemented
SF0332 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $66,216 $5,557 Implemented
IC0114 # 13 Y:2006 13 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,383 $9,400 Implemented
IC0114 # 12 Y:2006 12 2006 REPAIR AND ELIMINATE STEAM LEAKS $2,000 $2,800 Implemented
IC0114 # 03 Y:2006 03 2006 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $19,000 $63,000 Implemented
IC0114 # 09 Y:2006 09 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,414 $65,273 Implemented
IC0114 # 10 Y:2006 10 2006 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,000 $8,400 Implemented
IC0114 # 11 Y:2006 11 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $4,400 $1,200 Implemented
IA0382 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $4,991 $501 Implemented
IA0382 # 03 Y:2006 03 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,778 $264 Implemented
IA0382 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,256 $391 Implemented
IA0382 # 09 Y:2006 09 2006 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $669 $645 Implemented
IA0382 # 14 Y:2006 14 2006 DIRECT WARMEST AIR TO COMBUSTION INTAKE $19,064 $1,000 Implemented
IA0382 # 13 Y:2006 13 2006 REPAIR AND ELIMINATE STEAM LEAKS $1,292 $600 Implemented
IA0382 # 20 Y:2006 20 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $268 $303 Implemented
IA0382 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,869 $51,870 Implemented