IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,617

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0195 # 11 Y:2000 11 2000 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $11,700 $500 Implemented
IA0246 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,060 $0 Implemented
IA0246 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,799 $202 Implemented
IA0246 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,999 $0 Implemented
MA0465 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $4,076 $4,125 Implemented
MA0465 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $845 $528 Implemented
MA0465 # 05 Y:2000 05 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $605 $400 Implemented
CO0464 # 01 Y:2000 01 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,600 $2,200 Implemented
CO0464 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,400 $350 Implemented
SD0248 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,837 $14,800 Implemented
SD0248 # 03 Y:2000 03 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,532 $7,536 Implemented
SD0248 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,585 $0 Implemented
SD0248 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,887 $4,950 Implemented
SD0248 # 07 Y:2000 07 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $11,600 $1,000 Implemented
SD0248 # 09 Y:2000 09 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,397 $8,500 Implemented
SD0248 # 11 Y:2000 11 2000 INSTALL SYSTEM TO COLLECT SCRAP $13,426 $11,836 Implemented
TN0685 # 02 Y:2000 02 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $49,590 $3,000 Implemented
TN0685 # 03 Y:2000 03 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $13,596 $0 Implemented
TN0685 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,083 $805 Implemented
TN0668 # 01 Y:1999 01 1999 REDUCE SCRAP PRODUCTION $674,570 $64,500 Implemented
TN0668 # 03 Y:1999 03 1999 OPTIMIZE PLANT POWER FACTOR $9,000 $26,000 Implemented
TN0668 # 04 Y:1999 04 1999 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $7,860 $8,370 Implemented
TN0668 # 05 Y:1999 05 1999 MODIFY CURRENT INCENTIVE PROGRAM $6,300 $1,200 Implemented
TN0668 # 06 Y:1999 06 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,696 $0 Implemented
TN0668 # 08 Y:1999 08 1999 METER WASTE WATER $1,120 $3,300 Implemented