Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,617
matching recommendationsSIC | 265 | Paperboard Containers And Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0195 # 11 Y:2000 | 11 | 2000 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $11,700 | $500 | Implemented |
IA0246 # 03 Y:2000 | 03 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,060 | $0 | Implemented |
IA0246 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,799 | $202 | Implemented |
IA0246 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,999 | $0 | Implemented |
MA0465 # 02 Y:2000 | 02 | 2000 | OPTIMIZE PLANT POWER FACTOR | $4,076 | $4,125 | Implemented |
MA0465 # 04 Y:2000 | 04 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $845 | $528 | Implemented |
MA0465 # 05 Y:2000 | 05 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $605 | $400 | Implemented |
CO0464 # 01 Y:2000 | 01 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,600 | $2,200 | Implemented |
CO0464 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,400 | $350 | Implemented |
SD0248 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,837 | $14,800 | Implemented |
SD0248 # 03 Y:2000 | 03 | 2000 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $4,532 | $7,536 | Implemented |
SD0248 # 04 Y:2000 | 04 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,585 | $0 | Implemented |
SD0248 # 05 Y:2000 | 05 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,887 | $4,950 | Implemented |
SD0248 # 07 Y:2000 | 07 | 2000 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $11,600 | $1,000 | Implemented |
SD0248 # 09 Y:2000 | 09 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,397 | $8,500 | Implemented |
SD0248 # 11 Y:2000 | 11 | 2000 | INSTALL SYSTEM TO COLLECT SCRAP | $13,426 | $11,836 | Implemented |
TN0685 # 02 Y:2000 | 02 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $49,590 | $3,000 | Implemented |
TN0685 # 03 Y:2000 | 03 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $13,596 | $0 | Implemented |
TN0685 # 07 Y:2000 | 07 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,083 | $805 | Implemented |
TN0668 # 01 Y:1999 | 01 | 1999 | REDUCE SCRAP PRODUCTION | $674,570 | $64,500 | Implemented |
TN0668 # 03 Y:1999 | 03 | 1999 | OPTIMIZE PLANT POWER FACTOR | $9,000 | $26,000 | Implemented |
TN0668 # 04 Y:1999 | 04 | 1999 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $7,860 | $8,370 | Implemented |
TN0668 # 05 Y:1999 | 05 | 1999 | MODIFY CURRENT INCENTIVE PROGRAM | $6,300 | $1,200 | Implemented |
TN0668 # 06 Y:1999 | 06 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,696 | $0 | Implemented |
TN0668 # 08 Y:1999 | 08 | 1999 | METER WASTE WATER | $1,120 | $3,300 | Implemented |