IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,865

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0692 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,790 $21,020 Implemented
WV0493 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,956 $44,486 Implemented
WV0493 # 02 Y:2014 02 2014 USE DEMAND CONTROLLER OR LOAD SHEDDER $19,168 $5,300 Implemented
WV0493 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,848 $509 Implemented
WV0493 # 04 Y:2014 04 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,786 $1,000 Implemented
WV0493 # 05 Y:2014 05 2014 UPGRADE CONTROLS ON COMPRESSORS $5,218 $10,000 Implemented
WV0493 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,192 $7,244 Implemented
WV0493 # 08 Y:2014 08 2014 INSULATE BARE EQUIPMENT $3,507 $1,251 Implemented
WV0493 # 09 Y:2014 09 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,643 $15 Implemented
MZ0149 # 01 Y:2014 01 2014 INSTALL OCCUPANCY SENSORS $18,116 $16,400 Implemented
MZ0149 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $4,128 $6,040 Implemented
MZ0146 # 01 Y:2014 01 2014 REDUCE VENTILATION AIR $14,453 $0 Implemented
MZ0146 # 02 Y:2014 02 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $34,621 $0 Implemented
MZ0146 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,588 $2,500 Implemented
UD0906 # 02 Y:2014 02 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,093 $0 Implemented
UD0906 # 03 Y:2014 03 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,503 $0 Implemented
UD0906 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $2,954 $1,575 Implemented
UD0906 # 06 Y:2014 06 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,456 $5,614 Implemented
UD0906 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,271 $1,000 Implemented
AM0656 # 01 Y:2014 01 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $103,415 $0 Implemented
AM0656 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,540 $15,500 Implemented
DL0128 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $59,000 $150,000 Implemented
DL0128 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,150 $101,600 Implemented
DL0128 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $18,200 $12,560 Implemented
DL0128 # 05 Y:2014 05 2014 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,000 $20,000 Implemented