Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
98
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0696 # 04 Y:2014 | 04 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $310 | $480 | Implemented |
CO0696 # 02 Y:2014 | 02 | 2014 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,140 | $500 | Implemented |
CO0635 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,050 | $4,130 | Implemented |
CO0569 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,770 | $3,520 | Implemented |
CO0569 # 09 Y:2005 | 09 | 2005 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,600 | $1,980 | Implemented |
CO0569 # 05 Y:2005 | 05 | 2005 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,040 | $1,980 | Implemented |
CO0569 # 04 Y:2005 | 04 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,930 | $7,590 | Implemented |
CO0569 # 11 Y:2005 | 11 | 2005 | INSTALL OCCUPANCY SENSORS | $560 | $710 | Implemented |
CO0569 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,470 | $1,000 | Implemented |
CO0546 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,450 | $110 | Implemented |
CO0546 # 02 Y:2004 | 02 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $974 | $2,964 | Implemented |
CO0521 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,000 | $200 | Implemented |
CO0521 # 03 Y:2003 | 03 | 2003 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,010 | $1,400 | Implemented |
CO0520 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,460 | $260 | Implemented |
CO0458 # 09 Y:2000 | 09 | 2000 | MOVE PRODUCT USING MECHANICAL MEANS | $5,280 | $6,720 | Implemented |
CO0458 # 04 Y:2000 | 04 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,000 | $2,360 | Implemented |
CO0458 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $450 | $270 | Implemented |
CO0431 # 07 Y:1999 | 07 | 1999 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $44,640 | $0 | Implemented |
CO0431 # 01 Y:1999 | 01 | 1999 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $16,420 | $21,500 | Implemented |
CO0431 # 06 Y:1999 | 06 | 1999 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $638,100 | $0 | Implemented |
CO0431 # 02 Y:1999 | 02 | 1999 | INSTALL TURBULATORS | $1,830 | $3,630 | Implemented |
CO0431 # 03 Y:1999 | 03 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,340 | $610 | Implemented |
CO0430 # 04 Y:1998 | 04 | 1998 | USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS | $-210 | $2,000 | Implemented |
CO0430 # 05 Y:1998 | 05 | 1998 | SELL COMBUSTIBLE WASTE | $15,970 | $56,700 | Implemented |
CO0430 # 03 Y:1998 | 03 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,470 | $1,280 | Implemented |