Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsSIC | 2821 | Plastics Materials And Resins |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0833 # 07 Y:2006 | 07 | 2006 | $6,204 | $0 | Implemented | |
GT0833 # 05 Y:2006 | 05 | 2006 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $29,400 | $0 | Implemented |
OK0739 # 05 Y:2006 | 05 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,090 | $7,944 | Implemented |
OK0739 # 01 Y:2006 | 01 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,798 | $9,750 | Implemented |
OK0739 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,587 | $191 | Implemented |
UM0315 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $526 | $225 | Implemented |
LL0252 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $886 | $525 | Implemented |
LL0252 # 08 Y:2006 | 08 | 2006 | INSULATE BARE EQUIPMENT | $76 | $79 | Implemented |
LL0252 # 04 Y:2006 | 04 | 2006 | TURN OFF STEAM TRACING DURING MILD WEATHER | $1,157 | $170 | Implemented |
LL0252 # 02 Y:2006 | 02 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $21,878 | $4,680 | Implemented |
LL0252 # 01 Y:2006 | 01 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $91,633 | $1,740 | Implemented |
MA0608 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,557 | $91,980 | Implemented |
MA0608 # 04 Y:2006 | 04 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,294 | $36,000 | Implemented |
MA0608 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,784 | $150 | Implemented |
MA0608 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $1,575 | $2,925 | Implemented |
MA0608 # 08 Y:2006 | 08 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $712 | $1,500 | Implemented |
MS0296 # 03 Y:2006 | 03 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $33,575 | $374 | Implemented |
MS0296 # 05 Y:2006 | 05 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,082 | $6,420 | Implemented |
MS0296 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $57,344 | $3,269 | Implemented |
WV0340 # 07 Y:2006 | 07 | 2006 | USE SYNTHETIC LUBRICANT | $3,001 | $90 | Implemented |
WV0340 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $8,729 | $2,605 | Implemented |
WV0340 # 02 Y:2006 | 02 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $42,375 | $27,500 | Implemented |
WV0340 # 13 Y:2006 | 13 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $598 | $1,170 | Implemented |
WV0340 # 09 Y:2006 | 09 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,384 | $800 | Implemented |
WV0340 # 08 Y:2006 | 08 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,647 | $1,000 | Implemented |