IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 283 Drugs
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0414 # 06 Y:2016 06 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $330 $1,140 Implemented
LE0414 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,482 $10,500 Implemented
LE0414 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,088 $14,625 Implemented
LE0414 # 02 Y:2016 02 2016 PREHEAT COMBUSTION AIR WITH WASTE HEAT $34,860 $36,000 Implemented
LE0414 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,057 $0 Implemented
LE0289 # 01 Y:2009 01 2009 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $19,778 $20,000 Implemented
LE0289 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,121 $304 Implemented
LE0289 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,888 $2,824 Implemented
LE0221 # 01 Y:2005 01 2005 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $20,632 $500 Implemented
LE0129 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,028 $2,500 Implemented
LE0129 # 02 Y:2002 02 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,610 $500 Implemented
LE0129 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $723 $0 Implemented
HO0157 # 03 Y:1997 03 1997 ADD AREA LIGHTING SWITCHES $1,213 $350 Implemented
HO0157 # 10 Y:1997 10 1997 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS $31,248 $20,000 Implemented
HO0157 # 09 Y:1997 09 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $4,716 $10,000 Implemented
HO0157 # 07 Y:1997 07 1997 $5,850 $20,000 Implemented
HO0157 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,962 $81,329 Implemented
HO0077 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,374 $9,484 Implemented
HO0077 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,135 $18,875 Implemented
HO0077 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $716 $2,035 Implemented
ST0045 # 10 Y:1985 10 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $371 $0 Implemented
ST0045 # 06 Y:1985 06 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $123 $720 Implemented
ST0045 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,948 $358 Implemented
ST0045 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,018 $200 Implemented
ST0045 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,803 $0 Implemented