IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

329

matching recommendations
Reset
SIC 2869 Industrial Organic Chemicals, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0745 # 01 Y:2006 01 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,706 $0 Implemented
UD0745 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,807 $34,035 Implemented
UD0745 # 07 Y:2006 07 2006 USE OPTIMUM THICKNESS INSULATION $8,710 $4,000 Implemented
UD0745 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,746 $8,200 Implemented
UD0745 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,408 $0 Implemented
UD0745 # 12 Y:2006 12 2006 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $941 $0 Implemented
LE0226 # 01 Y:2006 01 2006 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $154,145 $75,000 Implemented
LE0226 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $81,919 $51,275 Implemented
LE0226 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $50,061 $47,500 Implemented
LE0226 # 06 Y:2006 06 2006 REPAIR AND ELIMINATE STEAM LEAKS $14,515 $800 Implemented
LE0226 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,760 $500 Implemented
UM0254 # 02 Y:2004 02 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,650 $2,200 Implemented
UM0254 # 03 Y:2004 03 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,907 $0 Implemented
UM0254 # 06 Y:2004 06 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $3,010 $1,080 Implemented
UM0254 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,479 $1,038 Implemented
WI0459 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $340 $640 Implemented
IC0060 # 01 Y:2003 01 2003 REPAIR AND ELIMINATE STEAM LEAKS $148,006 $13,000 Implemented
IC0060 # 02 Y:2003 02 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $8,832 $13,240 Implemented
IC0060 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,390 $20,640 Implemented
IC0060 # 04 Y:2003 04 2003 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $163,590 $170,491 Implemented
IC0060 # 07 Y:2003 07 2003 REPAIR AND ELIMINATE STEAM LEAKS $11,372 $5,850 Implemented
IC0060 # 09 Y:2003 09 2003 RECOVER WASTE HEAT FROM EQUIPMENT $17,626 $13,998 Implemented
IC0060 # 10 Y:2003 10 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,705 $11,354 Implemented
LL0154 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $109,742 $60,716 Implemented
WV0243 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $2,317 $777 Implemented