IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

471

matching recommendations
Reset
SIC 295 Asphalt Paving And Roofing Materials
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0387 # 08 Y:2010 08 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,393 $2,851 Implemented
SF0387 # 09 Y:2010 09 2010 INSTALL OCCUPANCY SENSORS $920 $2,132 Implemented
SF0387 # 10 Y:2010 10 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,160 $3,840 Implemented
SF0387 # 11 Y:2010 11 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,342 $6,259 Implemented
AM0553 # 01 Y:2008 01 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $80,000 $960 Implemented
AM0553 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,080 $1,500 Implemented
AM0553 # 04 Y:2008 04 2008 OPTIMIZE PLANT POWER FACTOR $19,840 $30,650 Implemented
AM0553 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,380 $0 Implemented
AM0553 # 06 Y:2008 06 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,970 $500 Implemented
AM0553 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $460 $325 Implemented
SD0400 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,816 $2,235 Implemented
UA0008 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,848 $0 Implemented
UA0008 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,233 $1,400 Implemented
UA0008 # 06 Y:2007 06 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $6,248 $200 Implemented
UA0008 # 07 Y:2007 07 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $5,679 $200 Implemented
LL0263 # 01 Y:2007 01 2007 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $436,374 $470,000 Implemented
LL0263 # 03 Y:2007 03 2007 INSULATE BARE EQUIPMENT $88,211 $4,182 Implemented
LL0263 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $73,876 $28,200 Implemented
LL0263 # 06 Y:2007 06 2007 USE PHOTOCELL CONTROLS $6,235 $990 Implemented
LL0263 # 07 Y:2007 07 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,431 $745 Implemented
IA0390 # 01 Y:2006 01 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $53,488 $1,000 Implemented
IA0390 # 04 Y:2006 04 2006 REPAIR AND ELIMINATE STEAM LEAKS $8,812 $3,600 Implemented
IA0390 # 07 Y:2006 07 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,305 $896 Implemented
LM0111 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $2,109 $3,000 Implemented
LM0111 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $879 $5,000 Implemented