IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,818

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0502 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,060 $1,050 Implemented
CO0502 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $360 $30 Implemented
AS0321 # 02 Y:2002 02 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $42,990 $2,700 Implemented
AS0321 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,666 $100 Implemented
AS0321 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $16,063 $4,370 Implemented
AS0321 # 05 Y:2002 05 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $4,394 $323 Implemented
TA0027 # 02 Y:2002 02 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $39,800 $7,500 Implemented
TA0027 # 04 Y:2002 04 2002 USE SYNTHETIC LUBRICANT $4,783 $0 Implemented
TA0027 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,550 $45 Implemented
TA0027 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $925 $615 Implemented
TA0027 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $190 $160 Implemented
WI0419 # 01 Y:2002 01 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,499 $1,000 Implemented
WI0419 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,839 $5,926 Implemented
WI0419 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,475 $60 Implemented
WI0419 # 05 Y:2002 05 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $424 $39 Implemented
WI0419 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $173 $0 Implemented
WI0419 # 07 Y:2002 07 2002 INSTALL OCCUPANCY SENSORS $299 $700 Implemented
MA0506 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,554 $9,225 Implemented
MA0506 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,391 $1,102 Implemented
MA0506 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,289 $1,100 Implemented
MA0506 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $982 $3,275 Implemented
LM0031 # 05 Y:2002 05 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,152 $100 Implemented
LM0031 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $614 $20 Implemented
LM0031 # 07 Y:2002 07 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,421 $11,800 Implemented
LM0031 # 08 Y:2002 08 2002 DEVELOP STANDARD OPERATING PROCEDURES $19,915 $8,440 Implemented