Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,818
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0197 # 05 Y:2000 | 05 | 2000 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,365 | $920 | Implemented |
WV0196 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $321 | $80 | Implemented |
WV0196 # 03 Y:2000 | 03 | 2000 | INSULATE BARE EQUIPMENT | $11,584 | $699 | Implemented |
WV0196 # 04 Y:2000 | 04 | 2000 | USE OPTIMUM THICKNESS INSULATION | $264 | $298 | Implemented |
WV0196 # 05 Y:2000 | 05 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $11,981 | $688 | Implemented |
WV0196 # 07 Y:2000 | 07 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $950 | $20 | Implemented |
WV0196 # 08 Y:2000 | 08 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $328 | $401 | Implemented |
WV0196 # 09 Y:2000 | 09 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $2,040 | $150 | Implemented |
GT0692 # 01 Y:2000 | 01 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,357 | $2,000 | Implemented |
GT0692 # 02 Y:2000 | 02 | 2000 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $7,810 | $1,000 | Implemented |
GT0692 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,690 | $4,000 | Implemented |
IA0245 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $791 | $0 | Implemented |
IA0245 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $186 | $25 | Implemented |
IA0245 # 06 Y:2000 | 06 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $114 | $113 | Implemented |
IA0245 # 07 Y:2000 | 07 | 2000 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $97,398 | $100,000 | Implemented |
MA0467 # 01 Y:2000 | 01 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,467 | $640 | Implemented |
MA0467 # 02 Y:2000 | 02 | 2000 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $6,077 | $4,000 | Implemented |
MA0467 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,974 | $4,200 | Implemented |
MA0467 # 05 Y:2000 | 05 | 2000 | INSULATE BARE EQUIPMENT | $1,140 | $1,500 | Implemented |
MA0467 # 06 Y:2000 | 06 | 2000 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $951 | $500 | Implemented |
MA0467 # 07 Y:2000 | 07 | 2000 | INSULATE FEEDWATER TANK | $490 | $1,100 | Implemented |
WI0378 # 10 Y:2000 | 10 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $279 | $820 | Implemented |
TN0688 # 02 Y:2000 | 02 | 2000 | INSTALL EQUIPMENT TO MOVE PRODUCT | $211,827 | $100,400 | Implemented |
TN0688 # 09 Y:2000 | 09 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,290 | $0 | Implemented |
AS0279 # 03 Y:2000 | 03 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $858 | $60 | Implemented |