Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
117
matching recommendationsSIC | 301 | Tires And Inner Tubes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0515 # 06 Y:2021 | 06 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $150,000 | $700,000 | Implemented |
LE0515 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,306 | $1,500 | Implemented |
LE0515 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,213 | $0 | Implemented |
LE0515 # 03 Y:2021 | 03 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,441 | $1,500 | Implemented |
LE0515 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,658 | $6,990 | Implemented |
TT0214 # 06 Y:2019 | 06 | 2019 | OPTIMIZE PLANT POWER FACTOR | $13,401 | $5,000 | Implemented |
TT0214 # 01 Y:2019 | 01 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $223,429 | $3,000 | Implemented |
OK0940 # 09 Y:2016 | 09 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,700 | $1,000 | Implemented |
OK0940 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,231 | $2,782 | Implemented |
OK0940 # 06 Y:2016 | 06 | 2016 | INSTALL SET-BACK TIMERS | $1,433 | $1,280 | Implemented |
MZ0189 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,216 | $2,500 | Implemented |
MZ0189 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,865 | $880 | Implemented |
MZ0189 # 06 Y:2015 | 06 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,139 | $0 | Implemented |
MZ0195 # 01 Y:2015 | 01 | 2015 | INSULATE BARE EQUIPMENT | $349 | $500 | Implemented |
MZ0195 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,017 | $10,320 | Implemented |
MZ0195 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,672 | $860 | Implemented |
MZ0190 # 07 Y:2015 | 07 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,483 | $860 | Implemented |
IA0519 # 02 Y:2014 | 02 | 2014 | USE PHOTOCELL CONTROLS | $1,548 | $480 | Implemented |
IA0519 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,054 | $450 | Implemented |
IA0519 # 04 Y:2014 | 04 | 2014 | UPGRADE OBSOLETE EQUIPMENT | $178 | $35 | Implemented |
IA0519 # 06 Y:2014 | 06 | 2014 | INSTALL SPECTRAL REFLECTORS / DELAMP | $496 | $105 | Implemented |
TT0132 # 04 Y:2014 | 04 | 2014 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $13,713 | $25,000 | Implemented |
TT0132 # 11 Y:2014 | 11 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,407 | $8,750 | Implemented |
TT0132 # 01 Y:2014 | 01 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $12,064 | $20,731 | Implemented |
UA0112 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,385 | $2,330 | Implemented |