Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
986
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0600 # 09 Y:2007 | 09 | 2007 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $790 | $0 | Implemented |
TA0118 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,339 | $2,016 | Implemented |
TA0118 # 02 Y:2006 | 02 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,842 | $2,000 | Implemented |
TA0118 # 04 Y:2006 | 04 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,049 | $90 | Implemented |
TA0118 # 05 Y:2006 | 05 | 2006 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $520 | $0 | Implemented |
TA0118 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $350 | $0 | Implemented |
MA0594 # 01 Y:2006 | 01 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $123,147 | $15,525 | Implemented |
MA0594 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,354 | $121,835 | Implemented |
MA0594 # 05 Y:2006 | 05 | 2006 | REDUCE VENTILATION AIR | $5,860 | $3,505 | Implemented |
MA0594 # 06 Y:2006 | 06 | 2006 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $4,046 | $0 | Implemented |
MA0582 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,163 | $86,315 | Implemented |
MA0582 # 03 Y:2005 | 03 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $15,630 | $6,540 | Implemented |
MA0582 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,153 | $0 | Implemented |
MA0582 # 06 Y:2005 | 06 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,599 | $2,010 | Implemented |
MA0582 # 07 Y:2005 | 07 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,815 | $7,660 | Implemented |
MA0582 # 08 Y:2005 | 08 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $6,340 | $25,150 | Implemented |
MA0582 # 09 Y:2005 | 09 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,540 | $800 | Implemented |
MA0582 # 10 Y:2005 | 10 | 2005 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $1,584 | $1,300 | Implemented |
AM0494 # 01 Y:2005 | 01 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $14,700 | $5,000 | Implemented |
AM0494 # 02 Y:2005 | 02 | 2005 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $5,880 | $540 | Implemented |
AM0494 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,400 | $500 | Implemented |
AM0494 # 04 Y:2005 | 04 | 2005 | REPAIR OR REPLACE STEAM TRAPS | $4,450 | $800 | Implemented |
AM0494 # 05 Y:2005 | 05 | 2005 | OPTIMIZE PLANT POWER FACTOR | $3,870 | $9,160 | Implemented |
AM0494 # 08 Y:2005 | 08 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,330 | $12 | Implemented |
AM0494 # 09 Y:2005 | 09 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $870 | $0 | Implemented |