IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

986

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0277 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,705 $761 Implemented
IA0277 # 08 Y:2001 08 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,004 $5,000 Implemented
IA0277 # 09 Y:2001 09 2001 REPAIR AND ELIMINATE STEAM LEAKS $2,357 $2,400 Implemented
LM0019 # 04 Y:2001 04 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $3,087 $450 Implemented
LM0019 # 05 Y:2001 05 2001 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $10,000 $3,000 Implemented
UD0629 # 07 Y:2001 07 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,907 $0 Implemented
WV0218 # 02 Y:2001 02 2001 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $15,768 $13,800 Implemented
WV0218 # 03 Y:2001 03 2001 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,519 $1,362 Implemented
WV0218 # 04 Y:2001 04 2001 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $121 $60 Implemented
WV0218 # 06 Y:2001 06 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,713 $1,440 Implemented
WV0218 # 07 Y:2001 07 2001 INSULATE BARE EQUIPMENT $1,985 $276 Implemented
WV0218 # 08 Y:2001 08 2001 INSULATE BARE EQUIPMENT $3,625 $730 Implemented
WV0218 # 09 Y:2001 09 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,088 $1,200 Implemented
WV0218 # 11 Y:2001 11 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $18,480 $9,000 Implemented
HO0238 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $702 $60 Implemented
HO0238 # 04 Y:2000 04 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,736 $1,200 Implemented
HO0238 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,502 $600 Implemented
HO0238 # 06 Y:2000 06 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $840 $200 Implemented
HO0238 # 07 Y:2000 07 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $840 $250 Implemented
HO0238 # 08 Y:2000 08 2000 MOVE PRODUCT USING MECHANICAL MEANS $1,220 $40 Implemented
GT0701 # 04 Y:2000 04 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,420 $25,117 Implemented
GT0701 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $2,219 $0 Implemented
GT0701 # 06 Y:2000 06 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $30,845 $0 Implemented
MA0472 # 01 Y:2000 01 2000 REDUCE VENTILATION AIR $9,400 $0 Implemented
MA0472 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,991 $10,000 Implemented