IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,063

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0197 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $669 $610 Implemented
WV0197 # 05 Y:2000 05 2000 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,365 $920 Implemented
WV0196 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $321 $80 Implemented
WV0196 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $11,584 $699 Implemented
WV0196 # 04 Y:2000 04 2000 USE OPTIMUM THICKNESS INSULATION $264 $298 Implemented
WV0196 # 05 Y:2000 05 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,981 $688 Implemented
WV0196 # 07 Y:2000 07 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $950 $20 Implemented
WV0196 # 08 Y:2000 08 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $328 $401 Implemented
WV0196 # 09 Y:2000 09 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,040 $150 Implemented
GT0692 # 01 Y:2000 01 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,357 $2,000 Implemented
GT0692 # 02 Y:2000 02 2000 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,810 $1,000 Implemented
GT0692 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,690 $4,000 Implemented
IA0245 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $791 $0 Implemented
IA0245 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $186 $25 Implemented
IA0245 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $114 $113 Implemented
IA0245 # 07 Y:2000 07 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $97,398 $100,000 Implemented
MA0467 # 01 Y:2000 01 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,467 $640 Implemented
MA0467 # 02 Y:2000 02 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $6,077 $4,000 Implemented
MA0467 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,974 $4,200 Implemented
MA0467 # 05 Y:2000 05 2000 INSULATE BARE EQUIPMENT $1,140 $1,500 Implemented
MA0467 # 06 Y:2000 06 2000 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $951 $500 Implemented
MA0467 # 07 Y:2000 07 2000 INSULATE FEEDWATER TANK $490 $1,100 Implemented
WI0378 # 10 Y:2000 10 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $279 $820 Implemented
TN0688 # 02 Y:2000 02 2000 $211,827 $100,400 Implemented
TN0688 # 09 Y:2000 09 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $1,290 $0 Implemented