Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,091
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0223 # 09 Y:1998 | 09 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $485,295 | $705,960 | Implemented |
SD0196 # 11 Y:1998 | 11 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,972 | $7,130 | Implemented |
SD0196 # 13 Y:1998 | 13 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,500 | $8,500 | Implemented |
SD0196 # 17 Y:1998 | 17 | 1998 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $4,500 | $1,000 | Implemented |
SD0196 # 02 Y:1998 | 02 | 1998 | INSULATE BARE EQUIPMENT | $4,292 | $1,500 | Implemented |
SD0196 # 03 Y:1998 | 03 | 1998 | USE OPTIMUM THICKNESS INSULATION | $3,308 | $1,151 | Implemented |
SD0196 # 04 Y:1998 | 04 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,255 | $0 | Implemented |
SD0195 # 01 Y:1998 | 01 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,633 | $14,800 | Implemented |
SD0195 # 02 Y:1998 | 02 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,315 | $950 | Implemented |
SD0195 # 08 Y:1998 | 08 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,268 | $9,327 | Implemented |
SD0195 # 12 Y:1998 | 12 | 1998 | USE A RAG RECYCLE SERVICE | $8,640 | $200 | Implemented |
AM0318 # 01 Y:1998 | 01 | 1998 | USE OPTIMUM TEMPERATURE | $11,790 | $0 | Implemented |
AM0318 # 03 Y:1998 | 03 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,430 | $160 | Implemented |
AM0318 # 05 Y:1998 | 05 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $840 | $1,500 | Implemented |
AM0318 # 07 Y:1998 | 07 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $420 | $100 | Implemented |
DS0111 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,394 | $7,486 | Implemented |
DS0111 # 02 Y:1998 | 02 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,145 | $0 | Implemented |
DS0111 # 05 Y:1998 | 05 | 1998 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,065 | $1,600 | Implemented |
WV0139 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,443 | $9,661 | Implemented |
WV0139 # 02 Y:1998 | 02 | 1998 | INSULATE BARE EQUIPMENT | $804 | $576 | Implemented |
WV0139 # 03 Y:1998 | 03 | 1998 | INSULATE BARE EQUIPMENT | $8,320 | $1,032 | Implemented |
WV0139 # 08 Y:1998 | 08 | 1998 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $5,400 | $100 | Implemented |
WV0139 # 10 Y:1998 | 10 | 1998 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $37,500 | $50,000 | Implemented |
NV0101 # 01 Y:1998 | 01 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $166 | $200 | Implemented |
NV0101 # 02 Y:1998 | 02 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $87 | $74 | Implemented |