IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

177

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0189 # 09 Y:2000 09 2000 INSTALL SKYLIGHTS $2,123 $2,436 Implemented
WV0189 # 12 Y:2000 12 2000 $13,104 $375 Implemented
GT0685 # 01 Y:2000 01 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,280 $0 Implemented
GT0685 # 02 Y:2000 02 2000 REPROCESS SPENT OILS ON SITE FOR RE-USE $13,650 $11,650 Implemented
GT0685 # 03 Y:2000 03 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $714 $500 Implemented
GT0685 # 04 Y:2000 04 2000 UPGRADE CONTROLS ON COMPRESSORS $28,840 $7,000 Implemented
GT0685 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,955 $0 Implemented
TN0676 # 03 Y:2000 03 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $6,275 $18,200 Implemented
TN0676 # 05 Y:2000 05 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $4,496 $12,200 Implemented
TN0676 # 06 Y:2000 06 2000 SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON $3,095 $6,250 Implemented
TN0676 # 07 Y:2000 07 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $1,025 $175 Implemented
SD0240 # 01 Y:2000 01 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $114,651 $214,102 Implemented
SD0240 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,067 $2,600 Implemented
SD0240 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $193 $714 Implemented
SD0240 # 05 Y:2000 05 2000 $6,552 $6,000 Implemented
AS0272 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $160 $145 Implemented
AS0272 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,392 $14,863 Implemented
AS0272 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $502 $781 Implemented
AS0272 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $299 $440 Implemented
AS0272 # 07 Y:2000 07 2000 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $2,419 $295 Implemented
HO0225 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $999 $1,969 Implemented
UD0589 # 03 Y:2000 03 2000 $34,765 $0 Implemented
UD0589 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $5,192 $640 Implemented
TN0677 # 02 Y:2000 02 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,356 $5,625 Implemented
ME0282 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $80,666 $36,000 Implemented