IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

338

matching recommendations
Reset
SIC 3084 Plastics Pipe
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0529 # 09 Y:2016 09 2016 DEVELOP A REPAIR/REPLACE POLICY $83 $168 Implemented
WV0529 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $234 $90 Implemented
WV0529 # 07 Y:2016 07 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $498 $585 Implemented
WV0529 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $993 $125 Implemented
OK0921 # 05 Y:2015 05 2015 REDUCE FLUID FLOW RATES $32,332 $5,000 Implemented
OK0921 # 04 Y:2015 04 2015 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $89,313 $72,000 Implemented
OK0921 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $13,915 $4,348 Implemented
OK0921 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,838 $28,060 Implemented
OK0916 # 01 Y:2015 01 2015 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $12,740 $0 Implemented
OK0916 # 03 Y:2015 03 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $30,382 $0 Implemented
OK0916 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,579 $3,451 Implemented
OK0916 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,642 $1,150 Implemented
OK0902 # 02 Y:2015 02 2015 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $739 $468 Implemented
OK0902 # 11 Y:2015 11 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $904 $520 Implemented
OK0902 # 12 Y:2015 12 2015 INSULATE BARE EQUIPMENT $44,461 $58,968 Implemented
OK0902 # 13 Y:2015 13 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $48,188 $144,447 Implemented
OK0902 # 14 Y:2015 14 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $520 $1,320 Implemented
OK0855 # 04 Y:2013 04 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $8,807 $2,070 Implemented
OK0855 # 06 Y:2013 06 2013 USE RADIANT HEATER FOR SPOT HEATING $3,427 $15,550 Implemented
OK0855 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,693 $20,825 Implemented
OK0855 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,095 $69,580 Implemented
OK0855 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,628 $22,407 Implemented
OK0855 # 12 Y:2013 12 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,606 $3,000 Implemented
OK0855 # 21 Y:2013 21 2013 OPTIMIZE PLANT POWER FACTOR $17,798 $13,508 Implemented
OK0855 # 02 Y:2013 02 2013 INSTALL SET-BACK TIMERS $4,654 $1,287 Implemented