IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

338

matching recommendations
Reset
SIC 3084 Plastics Pipe
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0337 # 05 Y:1999 05 1999 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $11,000 $28,700 Implemented
TN0644 # 02 Y:1998 02 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $32,370 $50,000 Implemented
TN0644 # 03 Y:1998 03 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $17,850 $32,200 Implemented
TN0644 # 06 Y:1998 06 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,180 $2,030 Implemented
KU0503 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $24,460 $29,380 Implemented
KU0503 # 02 Y:1998 02 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,580 $2,350 Implemented
KU0503 # 03 Y:1998 03 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $2,650 $7,560 Implemented
KU0503 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,110 $1,750 Implemented
KU0503 # 07 Y:1998 07 1998 REPAIR AND ELIMINATE STEAM LEAKS $1,030 $120 Implemented
KU0503 # 08 Y:1998 08 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $890 $0 Implemented
KU0503 # 09 Y:1998 09 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $820 $1,000 Implemented
KU0503 # 10 Y:1998 10 1998 INSTALL OCCUPANCY SENSORS $790 $1,100 Implemented
KU0503 # 11 Y:1998 11 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $760 $310 Implemented
KU0503 # 13 Y:1998 13 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $12,230 $41,100 Implemented
UF0185 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,893 $4,059 Implemented
UF0185 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,979 $1,725 Implemented
UF0185 # 03 Y:1997 03 1997 CONVERT TO INDIRECT TEMPERATURE CONTROL SYSTEM $20,417 $19,200 Implemented
UF0185 # 04 Y:1997 04 1997 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $11,382 $32,000 Implemented
UF0185 # 06 Y:1997 06 1997 USE MAGNETIC TECHNOLOGY TO TREAT WATER $11,000 $43,500 Implemented
UF0185 # 07 Y:1997 07 1997 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $420,104 $47,500 Implemented
UF0185 # 08 Y:1997 08 1997 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $21,156 $0 Implemented
AR0118 # 02 Y:1997 02 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $436 $335 Implemented
AR0118 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,472 $4,700 Implemented
AR0118 # 04 Y:1997 04 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $293 $0 Implemented
AR0118 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,466 $210 Implemented