Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
47
matching recommendationsSIC | 3086 | Plastics Foam Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0446 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $7,640 | $28,695 | Implemented |
SF0446 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,568 | $5,796 | Implemented |
SF0446 # 05 Y:2014 | 05 | 2014 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $17,849 | $58,975 | Implemented |
SF0446 # 04 Y:2014 | 04 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,787 | $8,897 | Implemented |
SF0446 # 02 Y:2014 | 02 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $477 | $131 | Implemented |
SF0446 # 01 Y:2014 | 01 | 2014 | REPAIR AND ELIMINATE STEAM LEAKS | $3,935 | $840 | Implemented |
SD0467 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,612 | $500 | Implemented |
SD0467 # 02 Y:2013 | 02 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,483 | $12,710 | Implemented |
SD0467 # 05 Y:2013 | 05 | 2013 | REPAIR AND ELIMINATE STEAM LEAKS | $2,867 | $200 | Implemented |
SD0467 # 06 Y:2013 | 06 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,309 | $200 | Implemented |
SD0467 # 08 Y:2013 | 08 | 2013 | USE PHOTOCELL CONTROLS | $1,846 | $2,628 | Implemented |
SD0467 # 01 Y:2013 | 01 | 2013 | REDUCE SCRAP PRODUCTION | $24,055 | $56,924 | Implemented |
SF0425 # 08 Y:2013 | 08 | 2013 | HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE | $692 | $2,830 | Implemented |
SF0425 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,808 | $7,235 | Implemented |
SF0425 # 02 Y:2013 | 02 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,421 | $7,471 | Implemented |
SF0425 # 07 Y:2013 | 07 | 2013 | INSTALL OCCUPANCY SENSORS | $3,416 | $13,849 | Implemented |
SF0425 # 01 Y:2013 | 01 | 2013 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $6,713 | $0 | Implemented |
SF0323 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,432 | $8,974 | Implemented |
SF0323 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,718 | $3,434 | Implemented |
SD0289 # 05 Y:2002 | 05 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,096 | $300 | Implemented |
SD0286 # 06 Y:2002 | 06 | 2002 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,250 | $0 | Implemented |
SD0286 # 07 Y:2002 | 07 | 2002 | INSTALL OCCUPANCY SENSORS | $2,292 | $0 | Implemented |
SD0286 # 09 Y:2002 | 09 | 2002 | USE EVAPORATION TO CONCENTRATE MATERIAL | $540 | $300 | Implemented |
SD0286 # 11 Y:2002 | 11 | 2002 | INSTALL EQUIPMENT TO MOVE PRODUCT | $9,000 | $3,500 | Implemented |
SD0286 # 14 Y:2002 | 14 | 2002 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $3,348 | $7,000 | Implemented |