IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,878

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0435 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,988 $4,310 Implemented
SD0435 # 05 Y:2011 05 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $2,282 $1,000 Implemented
SD0435 # 06 Y:2011 06 2011 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $866 $840 Implemented
WV0426 # 01 Y:2011 01 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,820 $1,000 Implemented
WV0426 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,303 $29,900 Implemented
WV0426 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,594 $458 Implemented
WV0426 # 08 Y:2011 08 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,197 $0 Implemented
WV0426 # 10 Y:2011 10 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $723 $21 Implemented
TT0065 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,000 $12,200 Implemented
TT0065 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,990 $5,000 Implemented
TT0065 # 09 Y:2011 09 2011 INSULATE BARE EQUIPMENT $65,500 $61,500 Implemented
AM0595 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,770 $350 Implemented
AM0595 # 02 Y:2011 02 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,150 $160 Implemented
AM0595 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,190 $2,240 Implemented
AM0595 # 04 Y:2011 04 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,850 $1,160 Implemented
AM0595 # 05 Y:2011 05 2011 INSULATE BARE EQUIPMENT $2,900 $1,000 Implemented
AM0595 # 06 Y:2011 06 2011 INSULATE BARE EQUIPMENT $2,300 $200 Implemented
AM0595 # 07 Y:2011 07 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,130 $1,380 Implemented
AM0595 # 08 Y:2011 08 2011 USE SYNTHETIC LUBRICANT $1,830 $0 Implemented
AM0595 # 09 Y:2011 09 2011 PAY UTILITY BILLS ON TIME $229 $0 Implemented
NC0423 # 01 Y:2011 01 2011 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $1,468,749 $650,000 Implemented
NC0423 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,736 $100 Implemented
NC0423 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,209 $115,608 Implemented
NC0423 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,230 $4,585 Implemented
AM0590 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,375 $1,500 Implemented