IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0042 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,500 $340 Implemented
CW0114 # 04 Y:2020 04 2020 USE COMPRESSOR AIR FILTERS $244 $95 Implemented
CW0114 # 06 Y:2020 06 2020 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,504 $0 Implemented
CW0114 # 10 Y:2020 10 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $356 $90 Implemented
CW0114 # 02 Y:2020 02 2020 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $10,400 $0 Implemented
UD0981 # 01 Y:2018 01 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,044 $0 Implemented
UD0981 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,028 $500 Implemented
UD0981 # 08 Y:2018 08 2018 INSULATE BARE EQUIPMENT $6,131 $4,525 Implemented
UM0429 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,689 $59,040 Implemented
UM0429 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,525 $1,000 Implemented
UM0429 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $23,321 $5,000 Implemented
UM0426 # 04 Y:2013 04 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $1,407 $1,500 Implemented
UM0426 # 01 Y:2013 01 2013 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,129 $17,000 Implemented
UM0426 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,226 $1,000 Implemented
UM0403 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,740 $6,369 Implemented
UM0401 # 03 Y:2012 03 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $34,019 $5,000 Implemented
UM0401 # 04 Y:2012 04 2012 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,066 $448 Implemented
UM0317 # 01 Y:2007 01 2007 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $24,281 $50,000 Implemented
UM0317 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $9,662 $6,000 Implemented
UM0317 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $14,750 $1,970 Implemented
UM0317 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $3,666 $828 Implemented
UM0264 # 01 Y:2004 01 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $47,250 $2,600 Implemented
UM0241 # 02 Y:2003 02 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,350 $8,000 Implemented
UM0241 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $910 $75 Implemented
UM0241 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,270 $10,510 Implemented